ML19319B940

From kanterella
Jump to navigation Jump to search
Notifies That 770222 & 770302 Requests for Deferring Selected Preoperational Tests & Requirements for Radiation Monitors Are Acceptable,Subj to Conditions for Feedwater Rupture Control,Ground Grid & Decay Heat Removal Sys Tests
ML19319B940
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1977
From: Stolz J
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001290677
Download: ML19319B940 (2)


Text

x

^

v

+

4'

" Distr 9bution v

Docket File NRC PDR AER S 1977 Local PDR UlR 1 File D. B. Vassallo F. J. Williams J. Stolz Decket tio. 50-346 L. Engle E. Hylton ACRS (16)

Toledo Edison Company ELD ATT*i: fir. Lowell E. Roe IE (3)

Vice President, Facilities H. Smith Development Dueffort Hays IE (Region 3)

Edison Plaza J. Roe 300 Madison Avenue C. Heltemes Toledo, Ohio 43652 Gentlenen:

SUBJECT:

TOLECO EDISON CC;'PA:lY'S PRECPERATI0'IAL TEST PROGP#1 RELIEF REQUEST FOR TifE DAVIS SESSE iii'CLEA PCtiER STATIG*l, U' LIT 1 He have new ccccleted our review and evaluation of your croposals for deferring selected preccerational tests as delineated in your letters of February 22, 1977 and !! arch 2,1977. Our review and evaluation was conducted jointly with the staff of the Office of Inspection and Enforcec.ent, Region III.

Your requests for teeporary waivers of Technical Spr::ification requirenents for radiation nonitecrs (as provided in your " arch 2,1977 letter to the tiRC) has been approved by the staff.

Based on our review and evaluatio, we find your deferral of preopera-tional tests as specified in your letters of February 22, 1977 and

' arch 2,1977, to he acceptable subject to the following restrictions and ccnditions:

(1) Itea 16. TP 315.01 - Steam and Feedwater Rupture fontrol System Test (3/2/77 letter) - All required testinq should be satisfactorily completed prior to proceeding teyond Stode 3.

Based on tebr%ne conversations with your plant staff on March 11, 1977, we were inforr.ed that you plan to conplete testing prior to croceeding beyond Mode 3.

However, we raquest that you confirm this under-standing in writing to us within five days receipt of this letter.

D k

ooI 1

1D

. JD. AIb~

9 l

n

_a 3

' rwics >

o

.u.a.a ess >

anTa >

r.-ac.no <n s.m acu ono

  • um..........o,,..,.....go012kg jp

p 2

C 4

APR 3 1977 Toledo Edison Company 2-

'(2)

Item 20. TP 401.11 - Instrument Ground Grid System Test (3/2/77 letter) -

We require that suffic'. at measurements and an engineering evaluation be completed prior to fuel loading which will enable you to conclude that there is sufficient isolation between grounding systems to oreclude any adverse effects on instrumentation or equionent that will be required to be operable as specified in the Technical Specifications for Pode 6 through !! ode 3.

We also require that you complete all testing and satisfy the acceptance criteria for the test prior to entering " ode 2.

(3) Item 7 TP 230.03 - Decay Heat Removal Test (3/2/77 letter) - Your verbal comittment on April 1,1377, to con 91ete this test prior tn entering liede 4 has been found to be acceptable. Powever, we recuest that you confirm this understanding in writing to us within five days after receipt of this letter.

Please call us if you have any questions regarding our restrictions and conditions to the specified test procedures identified above.

A copy of this letter is being sent to the Office of Inscection and Enforcement, Region III.

Sincerely, Or! sinal Siened by John F. Stolz John F. Stolz, Chief Licht Water Reactors Branch '!o.1 Division of Project Management cc: Mr. Donald H. Hauser, Esq.

The Cleveland Electric Illuninating Comoany P. O. Box 5000 Cleveland, Ohio 44101 Gerald Charnoff, Esq.

Shaw, Pittnan, Potts and Trowbridge 1000 H Street, N. W.

Washington, D. C.

20036 Leslie henry, Esq.

D[

D Fuller, Seney, Henry and Hodge U

g, a00 "adison Avenue Toledo, thio 43504 9

' '(

~