Requests Immediate Response to Questions Re LOCA Analysis & ECCS Design,Qa for Operation,Industrial Security Plan & Radioactive Matls safety.740705 Status of First Round Responses Encl
ML19319B858
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/06/1974
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Sampson G
TOLEDO EDISON CO.
Shared Package
ML19319B859 List:
References
NUDOCS 8001280684
Download: ML19319B858 (4)


Text

_ -_

G' fd]G 6 'G74 Docket No. 50-346 1

Q9 0

0 The Toledo Edison Cetapany CD ATTU:

Mr. Glenn J. Samoson Vice President, Power n1 rQ^

0 300 Edison Plaza Toledo, Ohio 43652 L

k J

U Centlemen:

The schedule for our review of your operating license application which is contained in our November 23, 1973 and March 1, 1974 letters to you, required completion of your responses to our first-round requests for information by July 5, 1974. We have eca.tved responses to those requests by FSAR Amendnent Nos. 17 thru 21, Revisions 3 thru 7 respec-tively, and va are resuming our detailed review in order to prepare our positions.

As our review progresses, we vill forward to you any additional questions we may have or requests for information which are necessary in order for un to complete our first-round review. Also as our positions on review matters are developed, they will be forwarded for your early consideration.

We urge that you give i=nediate attention to matters listed below sinec delay in co pletion of our first-round review may impact heavily on our overall review schedule.

1.

LOCA Analysis and ECCS Design As you are avsre, and as noted in our August 28, 1973 and December 26, 1973 letters to you, your application is deficient in information related to LOCA analysis and ECCS design.

It is our understanding that you intend to provide this information in Deceder 1974 and that the information will incorporate the new ECCS rule (10 C7R 50, Appendix K).

Please confirm this understanding by providing us with your schedule for submittal so that we may in turn schedule our effort and determine the impset of this phase of our first-rcund review on the overall review schedule.

i 2.

Quality Assurance for Operation

)

As a result of our meeting with you on July 17, 1974 regarding quality assurance for operations, it is our ut.derstanding that you will revise section 17.2 of the FSAR and resubmit the revised section by August 15, 1974.

l N

orrec e >

.u== a ws

  • ontu >

Foran AEC.319 (Rev. M)) AECM 02+0 C u. s. movsennesnt ensurine arricas v e74.sas-ise f

l 80012806

s m

9 9

Toledo Edison Conpany h~9~}

~

v

_.-)

3.

_ Industrial Security Plan _

It is our understanding that you intend to submit your Industrial Security Plan in August 1974. Please provide us with your schedule date for this submittal.

= +. Radioactive Materials Safety The AP.C recently issued Rerulatory Guida 1.70.3, " Additional Information Radioactive Materials Safety for Nuclear Power Plants".

February 1974 This guide describes the informatien which should be included in the FSAN,as Section 12.4, " Radioactive ".aterials Safety". In addition to submitting this section, you should propose Technical Specification; which state your surveillanca requirements designed to assure the safe handling and storage of radioactive materials.

The enclosure to this letter contains the status of first-round responses as of July 5,1974. The status as of February 23. 1974 was enclosed with our March 1, 1974 letter.

If you have any questions regarding the above or the enclosure, plesso contact us.

Sincerely, D:d &:a! Si.mel by s

L-vitg A. Pettier A. Schwencer, Chief Light '4ater Reactors 3 ranch 2-3 Directorate of Licensing

Enclosure:

Status of Davis-Besse 1 First-Round Responses ces: See next page orrecs >

evanaus >

oats >

Forum AEC.318 (Rev. SS)) AECM 0240 W u. s. sovamesmant sauevues arrecs ve,4.sae.see

4-Toledo Liison Company kl 91 a Al ces: Donald 11.1!auser, " squire n' Dl Q The Cleveland Electric Illut:iinating Co.

(

P. O. Box 5000,Itoom 610 L

lk u A-U Cleveland, Ohio 44101 Gerald Charnoff, Esquire Shaw, Pittman, Potts, Trowbridge

-l and Madden 910 - 1: h Street, N. W.

Washingtin, D. C.

20006 Leslie I!cnry, Esquire l

Fuller, Seney, Henry, j

and Hodge 300 Owens-Illinois Zuilding 405 Madison Avenue Toledo, Ohio 43604 "rs. Evelyn Stebbins, Chairnan Coalition for Safe Electric Power 312 Park Building 140 Public Square Cleveland, Ohio 44114 DISTRIBUTION:

Doc'.at Files AEC PDR LPDR LWR 2-3 Reading V!!oore JHendrie DEisenhut AKenneke RKlecker OGC R0 (3) i IPeltier l

EGoulbourne TR BCs LWR 1 & 2 BCs l

ACRS (16) l x7886/ LWR 2-:

L:C/LWE 2-3 o,, c e,.

ev-*=.,

IPe.l. ie. _:.cjbgASch9e Fet,,_,

N [ Ell 4

- ?S

- 0. l.-.Dlh este >

Form ABC 319 (Rev. 9-13) ABO 4 0240

$ w. e. movananseur pointime orrecas s ete.eae see

STATUS OF DAVIS-BESSE 1 FIRST-ROUND RESPONSES AS OF JULY 5, 1974 I.

Requests to which applicant has postponed responses (until futare FSAR submittals) - none.

II.

Requests to which applicant will respond when information becomes available.

Request No.

4.4.2 tuecember 1974) 6.2.12 (unknnwn) 15.2.9 (December 1974)

III.

Requests which received response, but which may require additional information.

Request No.

Request No.

Request No.

3.9.7 4.4.1 thru 4.4.3 6.3.21 4.2.lb 5.2.1 thru 5.2.4 15.1.2 4.2.lf 5.5.1 15.2.3 4.2.2b 6.3.1 thru 6.3.1 15.2.7 thru 15.2.17 4.2.7 6.3.10 thru 6.3.15 15.3.1 thru 15.3.3 4.2.8 6.3.17 thru 6.3.19

_