Site: Davis Besse 
Issue date: 03/01/1974
From: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
To: Sampson G
TOLEDO EDISON CO.
References
NUDOCS 8001280696
Download: ML19317F766 (3)


Text

.

.a.

,_----.s~

4.:.

y-3 e?

,=_

y s

a w>~

AEC PDR SCummings Lpdal PDR SBlock Wocket LWR 2-3 Rdg Docket No. 50-346 MAR 1 Igr4 VAM re DEisenhut IAPeltier EIGoulbourne ACRS (16)

RWKlecker The Toledo Edison Co=pany ATTN: Mr. Glenn J. Sampson ASchwencer,5 extra cps WHouston Vice President, Power 300 Edison Plaza RVanNiel Toledo, Ohio 43652 TNovak JMazetis Gentlenen:

RVollmer JKastner In respence to your letter of December 12, 1973 regarding the Reviev Schedule for the Davis-Besse Nuclear Power Station, we have reviewed the schedule and have advanced the Prospective Decision Date from Septenber 1, 1975 to August 1, 1975 as you suggested. The only impact this change vill have on other key milcatones is to advance the post ACES Safety Evaluation Report Supplement from August 1,1975 to July 15, 1975.

(Refer to our schedule letter to you dated November 23, 1973.)

In addition to reviewing the schedule, we have conducted a preliminary review of your responses to first-round requests for information to the extent that time has per=1tted to date. The purpose of the preliminarf review was to highlight any obvious areas of deficiency in your responses at en early date. Therefore, it should not be interpreted that the review is complete or necessarily thorough. However, ve hope the information vill be useful to you.

Enclosed is a list of the outstanding requests which either have net received a response or the corresponding responses may require additiorail inforr.ation or clarification for our review. The requests are numbered as they were in the original request letters and are in three categories:

I.

Requests to which the applicant has postponed response until future FSAR submittals.

II. Requests to which the applicant will respond when i p:4t$n comes available.

D ID Wc$

1mL 8001280 [k

[

^

.u Giann J. Sampson 2-MAR 1 1974 III. Requests which received response but which may require additional information.

The first two categories contain requests for information necessary for completion of our first-round review. The third category contains request for which further discussion (possibly at meetings) will be required prior to our issuing of Safety Positions (second-round).

When other areas of concern to us become apparent or you respond to requests listed in categories I and II above, the enclosed list will be updated. If you have any questions regarding the enclosure please contact us.

Sincerely, Original Signed A. Scimencar, Chief Light Water Reactors Br. 2-3 Directorate of Licensing

Enclosure:

Ta' ole of Davis-Desse First-Round 7OO 0

0 Responses as of Feb. 28, 1974 o v OL ces: Donald 11. Hauser, Esquire m

The Clevoland Electric IllurJ.nating Co.

0 0

g-

_[,k P. O. Box 5000, Room 610 U

_3 Cleveland, Ohio 44101 Gerald Charnoff, Esquire Shaw, Pittr.an, Potts, Trowbridge &

Madden 910 - 17th Street, NW Washington, D. C.

20006 Leslie Henry, Isquire Fuller, Seney, Henry & Hodge 800 Owens-Illinois Bldg.

405 Madison Avenue Toledo, Ohio 43604 LWR 2-3 L:C/ WE 2-3

,,,,c,,

IAPelt f

ASen cer

.o,,,,..,

} 7- /74 j / f /74 2/

Forse AEc.313 (Rev. 9 53) AECM 0240 oro c.a se e t.e s. e sao.aa e y

~

MAR 1 1974 STATUS OF DAVIS-BESSE FIRST-ROUND RESPONSES AS OF FEBRUARY 28, 1974 I.

Requests to which applicant has postponed response (until future FSAR submittals).

Request No.

Request No.

Request No.

3.9.6 6.2.21 7.4.1 4.4.2 6.2.23 9.2.8 5.5.4 6.2.26 9.3.10 6.2.1 6.3.6 15.1.4 6.2.2 6.3.9 15.4.1 6.2.7 6.3.13 15.4.6 6.2.8 6.3.18 16.0.1 6.2.9 7.2.1 6.2.12 7.2.2 6.2.20 7.2.4 II.

Requests to which applicant will respond when information becomes available.

Request No.

Request No.

Request No.

3.9.7

~

4.2.11 13.7 (1/18/73) 4.2.7 4.4.3 14.1 (1/18/73) 4.2.8 6.3.21 14.2 (1/18/73) 4.2.9 6.3.22 15.1.5 4.2.10 13.1.3.2 (1/18/73) 15.2.9 III.

Requests which received response but which may require additional Infor=ation.

Request No.

Request No.

Request No.

4.2.lb 6.3.3 15.2.11 4.2.lf 6.3.5 15.2.12 4.2.2b 6.3.10 15.2.15 4.4.1 6.3.11 15.3.1 5.2.4 6.3.12 15.3.2 5.5.1 6.3.14 17.2.1 4