UNITED STATES
e '. 't
.
NUCLEAR REGULATORY COMMISSION
O
REGION lli
GLEN ELLYN, ILLINOIS 60137
FAY 20 1975
Toledo Edison Company
Docket No. 50-346
ATIN:
Mr. Lowell E. Roe
Vice President, Power
Edison Plaza
'
300 Madison Avenue
Toledo, Ohio
43652
-
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton, Naidu,
Jeblonski and Hayes of this office on April 21-23, 1975, of activities
at Davis-Besse Unit 1 authorized by NRC Construction Permit No. CPPR-80
and to the discussion of our findings with you and Messrs. Novak and
Lenardson and others of your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
/
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
The inspector also ar==ined actions you have taken with respect to the
matters identified in your letter dated March 26, 1975, which we
previously brought to your attention. We have no further questions
regarding these matters.
During this inspection, it was found that certain of your activities
appear to be in noncompliance with NRC requirements. The item and
reference to the pertinent requirements are listed under Enforcement
Action in the Sununary of Findings Section of the enclosed inspection
report.
This notice is sent to you pursuant to the provisions of Section 2.201
i
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice, a written statement or
i
i
p *" %
<
n
8001270 lO7
1
?
9
'
%
/
76-19N
- 7
l
l
_
__ - -
__
. _ _ _ _ _ _
g
$
"Ay 2e 1 o'r
Toledo Edison Company
-2-
explanation in reply, including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) corrective steps which will
be taken to avoid further items of noncompliance; and (3) the date when
full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice will be
placed in the NRC's Public Document Room.
If this report contains any
information that you or your contractors believe to be proprietary, it
is necessary that you make a written application to this office, within
twenty days of your receipt of this notice, to withhold such information
from public disclosure.
Any such application must include a full statement
of the reasons for which it is claimed that the information is proprietary,
and should be prepared so the proprietary information identified in the
application is contained in a separate part of the document. Unless we
receive an application to withhold information or are otherwise contacted
within the specified time period, the written material identified in
this paragraph will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch