Forwards IE Insp Rept 50-346/75-07 on 750421-23.No Noncompliance Noted
ML19319B583
Person / Time
Site: Davis Besse 
Issue date: 05/20/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B576 List:
References
NUDOCS 8001270107
Download: ML19319B583 (2)


See also: IR 05000346/1975007

Text

.

-

\\

UNITED STATES

e '. 't

.

NUCLEAR REGULATORY COMMISSION

O

REGION lli

799 ROOSEVELT RO AD

GLEN ELLYN, ILLINOIS 60137

FAY 20 1975

Toledo Edison Company

Docket No. 50-346

ATIN:

Mr. Lowell E. Roe

Vice President, Power

Edison Plaza

'

300 Madison Avenue

Toledo, Ohio

43652

-

Gentlemen:

This refers to the inspection conducted by Messrs. Sutton, Naidu,

Jeblonski and Hayes of this office on April 21-23, 1975, of activities

at Davis-Besse Unit 1 authorized by NRC Construction Permit No. CPPR-80

and to the discussion of our findings with you and Messrs. Novak and

Lenardson and others of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas examined during the inspection. Within these areas, the inspection

/

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

The inspector also ar==ined actions you have taken with respect to the

matters identified in your letter dated March 26, 1975, which we

previously brought to your attention. We have no further questions

regarding these matters.

During this inspection, it was found that certain of your activities

appear to be in noncompliance with NRC requirements. The item and

reference to the pertinent requirements are listed under Enforcement

Action in the Sununary of Findings Section of the enclosed inspection

report.

This notice is sent to you pursuant to the provisions of Section 2.201

i

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice, a written statement or

i

i

p *" %

<

n

8001270 lO7

1

?

9

'

%

/

76-19N

  1. 7

l

l

_

__ - -

__

. _ _ _ _ _ _

g

$

"Ay 2e 1 o'r

Toledo Edison Company

-2-

explanation in reply, including:

(1) corrective steps which have been

taken by you, and the results achieved; (2) corrective steps which will

be taken to avoid further items of noncompliance; and (3) the date when

full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice will be

placed in the NRC's Public Document Room.

If this report contains any

information that you or your contractors believe to be proprietary, it

is necessary that you make a written application to this office, within

twenty days of your receipt of this notice, to withhold such information

from public disclosure.

Any such application must include a full statement

of the reasons for which it is claimed that the information is proprietary,

and should be prepared so the proprietary information identified in the

application is contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in

this paragraph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely yours,

D. M. Hunnicutt, Chief

Construction and Engineering

Support Branch

j

,

Enclosure:

IE Inspection Report No.

050-346/75-07