Text
O.
-
-
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
REGION Ill
CLEF 4 ELLYN. ILLINOIS 60137
FEB 19 1975
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Facilities
Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton, Naidu and
Jablonski of this office on January 22-24, 1975, of activities at
Davis-Besse Unit 1 Construction Site authorized by NRC Construction
Permit CPPR-80 and to a preliminary discussion of our findings with you
ac the conclusion of this iespection.
A formal management interview
was held with you and others of your staff on February 12, 1975.
The
results of this iaterview will be documented in a separate report.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
The inspector also examined actions you have taken with respect to the
matters identified in your letters of January 6 and 23, 1975, which we
previously had brought to your attention. We have no further questions
regarding these matters.
During this inspection, it was found that certain of your activities
appear to be in noncompliance with NRC requirements.
The items and
reference to the pertinent requirements are listed under Enforcement
Action in the Summary of Findings Section of the enclosed inspection
report.
In addition to our concern for corrective action with respect to the
specific items of noncompliance noted, we are concerned about your
system for management control of NRC licensed activities that has permit-
ted these items to occur.
Consequently, in your reply to this letter,
you should describe, in particular, those actions taken or planned to
improve the effectiveness of your management control over NRC licensed
activitics.
$'oWT%%
4
- %
]
f
37.)$
DOPY SENI 20: 233 / .
9
f4 e
LPD3
. h.) E
NSIC '
Wa-ett
II-
8001270 CQ
Q('"'N
Toledo Edison Company
-2-
' '
FEB 1 9 1975
In accordance uith Section 2.7f0 of the ICC's "Rulec of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of thic Ictter nrd the
encloacd incpection report uill be placed in the IOC'c Public Docuneut
P. con .
If thic report containa any infornation that you cr your centractors
believe to be proprietary, it is nececcary that you rehe a vritten
application to this office, uithin tventy dayn of your receipt of thin
letter, to trithhold such infor-ction fron public dicclocure.
.ay such
'
application r.unt include a full statercut of the rencons for t:hich it in
clcined that the inforration is proprietary, and chould he prepared co
the proprictcry inforration identified in the applicntion is centnined
in a neparate part of the docue.cnt.
Unlesu ce receive nn applicaticn to
withhold inforration or are otherui.,c centacted within the vpecified
tire period, the critten r.nterial identified in thi:: paragraph vill 1,e
placed in the Public Docurient Room.
This nctice is cent to you purcuant to the provicionn of Fection 2.201
of the Hr.C'n " Rules of Prnetice," Pert 2, Titic 10, Code of rederal
Rep,ulations.
Section 2.201 reouires you to subrir to this office within
thirty days of your receipt cf this notice, a written ctaterunt cr
er.planation in reply, including:
(1) corrective ateps t;hich have boon
taken by you, and the resulto achieved: (2) corrretc.,r, tern chich cill
eg
Le tahca to ascid further itens of nonconnlianco, and (2) the date uhen
(
full complinnce vill be achieved.
Such a statorent or c:<plcnation
2
's -
ohculd bo provided for ccch of the itcac listed.
Should you have any questions concerning thic incpection, ue vill be
glad to dincuss then with you.
Sincerely yours,
Jctes G. Ecppler
Regional Director
Enclosura:
IE Incpection Upt. No. 050-346/75-01
bec: IE Chief, FSLEB
IE:11Q (4)
Licensing (4)
DR Central Files
IE Files
Local PDR
~~
N
)
T1C
(_,/
,