Forwards IE Insp Rept 50-346/75-01 on 750122-24.Violations Noted in Summary of Findings Section
ML19319B571
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/19/1975
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B568 List:
References
NUDOCS 8001270098
Download: ML19319B571 (2)


See also: IR 05000346/1975001

Text

O.

-

-

UNITED STATES

NUCLEAR REGULATORY COMMISSION

-

REGION Ill

799 ROOSEVELT RO AD

CLEF 4 ELLYN. ILLINOIS 60137

FEB 19 1975

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E. Roe

Vice President, Facilities

Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Messrs. Sutton, Naidu and

Jablonski of this office on January 22-24, 1975, of activities at

Davis-Besse Unit 1 Construction Site authorized by NRC Construction

Permit CPPR-80 and to a preliminary discussion of our findings with you

ac the conclusion of this iespection.

A formal management interview

was held with you and others of your staff on February 12, 1975.

The

results of this iaterview will be documented in a separate report.

A copy of our report of this inspection is enclosed and identifies the

areas examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

The inspector also examined actions you have taken with respect to the

matters identified in your letters of January 6 and 23, 1975, which we

previously had brought to your attention. We have no further questions

regarding these matters.

During this inspection, it was found that certain of your activities

appear to be in noncompliance with NRC requirements.

The items and

reference to the pertinent requirements are listed under Enforcement

Action in the Summary of Findings Section of the enclosed inspection

report.

In addition to our concern for corrective action with respect to the

specific items of noncompliance noted, we are concerned about your

system for management control of NRC licensed activities that has permit-

ted these items to occur.

Consequently, in your reply to this letter,

you should describe, in particular, those actions taken or planned to

improve the effectiveness of your management control over NRC licensed

activitics.

$'oWT%%

4

  • %

]

f

37.)$

DOPY SENI 20: 233 / .

9

f4 e

LPD3

. h.) E

NSIC '

Wa-ett

II-

8001270 CQ

Q('"'N

Toledo Edison Company

-2-

' '

FEB 1 9 1975

In accordance uith Section 2.7f0 of the ICC's "Rulec of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of thic Ictter nrd the

encloacd incpection report uill be placed in the IOC'c Public Docuneut

P. con .

If thic report containa any infornation that you cr your centractors

believe to be proprietary, it is nececcary that you rehe a vritten

application to this office, uithin tventy dayn of your receipt of thin

letter, to trithhold such infor-ction fron public dicclocure.

.ay such

'

application r.unt include a full statercut of the rencons for t:hich it in

clcined that the inforration is proprietary, and chould he prepared co

the proprictcry inforration identified in the applicntion is centnined

in a neparate part of the docue.cnt.

Unlesu ce receive nn applicaticn to

withhold inforration or are otherui.,c centacted within the vpecified

tire period, the critten r.nterial identified in thi:: paragraph vill 1,e

placed in the Public Docurient Room.

This nctice is cent to you purcuant to the provicionn of Fection 2.201

of the Hr.C'n " Rules of Prnetice," Pert 2, Titic 10, Code of rederal

Rep,ulations.

Section 2.201 reouires you to subrir to this office within

thirty days of your receipt cf this notice, a written ctaterunt cr

er.planation in reply, including:

(1) corrective ateps t;hich have boon

taken by you, and the resulto achieved: (2) corrretc.,r, tern chich cill

eg

Le tahca to ascid further itens of nonconnlianco, and (2) the date uhen

(

full complinnce vill be achieved.

Such a statorent or c:<plcnation

2

's -

ohculd bo provided for ccch of the itcac listed.

Should you have any questions concerning thic incpection, ue vill be

glad to dincuss then with you.

Sincerely yours,

Jctes G. Ecppler

Regional Director

Enclosura:

IE Incpection Upt. No. 050-346/75-01