ML19319B555
| ML19319B555 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/09/1973 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sampson G TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B556 | List: |
| References | |
| NUDOCS 8001270087 | |
| Download: ML19319B555 (2) | |
See also: IR 05000346/1973002
Text
__
__ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
L
)
' %,
-
UNITED STATES
(o,
ATOMIC ENERGY COMMISSION
s
,o
,-
!
[o' . (
DIRECTOR ATE OF REGULATORY OPER ATI
REGION 888
ygggpgni,g
(3121858 2660
.)g g
799 ROOstyCLT ROAD
Go137
S*JE5 o' g
GLCN ELLYN, ILLINOIS
o
July 9, 1973
Docket No. 50-346
Toledo Edison Company
i
Mr. Glenn J. Sampson
ATTN:
Vice President, Power
Edison Plaza
300 Madison Avenue
- Toledo, Ohio 43652
Gentlemen:
informing us of the
3
Thank you for your letter dated June 29, 197 ,f noncompliance which we
steps you have taken to correct the items o
We
31, 1973.
brought to your attention in our letter dated May
inspection.
will examine these matters during our next
6/73-02, referenced in our
'~
A copy of RO Inspection Report No. 050-34In accordance with Section
)
letter of May 31, 1973, is enclosed.
il
10, Code of
2.790 of the AEC's " Rules of Practice," Part 2, T t e
letter of May 31,
Federal Regulations, a copy of this letter, ourenclosed inspection
29, 1973, and the
If the
Document Room.
1973, your letter of June
report will be placed in the AEC's Public
or your contractors
inspection report contains information which you
written
h
ou submit a
believe to be proprietary, it is necessary t at y20 days of the date of this
hheld from public disclosure.
application to this office, within
identify the basis for
requesting that such information be witIf such an app
The application should
identified is contained in
ietary.
which information is claimed to be proprbe prepared s
the application will also be
a separate part of the application, sinceIf we do not receive an applica
therwise contacted within thend the p
placed in the Public Document Room.
to withhold information, or are not o
specified time period, the enclosed report aletters w
Room.
.
\\
i
j,^-
-
.
g
,3
,
>
'
_
'
s
8001270 Og7
0
.
.
-- .
.
-
_ . - .
. -
- ..- - . -
-
!
l
i
$
1
-
i
.
!
2-
July 9, 1973
Toledo Edison Company
-
-
Unless you wish to make application to withhold information, no reply
to this letter is necessary; however, should you have questions con-
cerning the enclosed inspection report, we will be glad to discuss
them with you,
,
i
Sincerely yours,
!
.
Boyce H. Grier
,
Regional Director
Enclosure:
>
RO Inspection Rpt No. 050-346/73-02
i
bec w/1tr dtd June 29, 1973:
RO Chief, FS&EB
RO:HQ (4)
,
j
Licensing (4)
DR Central Files
j
Regions I & II
i
Local PDR
j
DTIE
.
O
l
6
l
i
-
$
l
1
s
,
,
---,n.-
.,-
,----,--,n-
- - - - - ,- , , , , - - , , ,
,--m--,
nw,
-,- , . , - .--_.m,--
, ,
--m,
, , , , - , , ,- - - , - .
.,,--,._,.,,_aw.
, -,
._m.,w,y
--m.--y---y