Ack Receipt of Informing AEC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/73-02
ML19319B555
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/09/1973
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson G
TOLEDO EDISON CO.
Shared Package
ML19319B556 List:
References
NUDOCS 8001270087
Download: ML19319B555 (2)


See also: IR 05000346/1973002

Text

__

__ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

L

)

' %,

-

UNITED STATES

(o,

ATOMIC ENERGY COMMISSION

s

,o

,-

ONS

!

[o' . (

DIRECTOR ATE OF REGULATORY OPER ATI

REGION 888

ygggpgni,g

(3121858 2660

.)g g

799 ROOstyCLT ROAD

Go137

S*JE5 o' g

GLCN ELLYN, ILLINOIS

o

July 9, 1973

Docket No. 50-346

Toledo Edison Company

i

Mr. Glenn J. Sampson

ATTN:

Vice President, Power

Edison Plaza

300 Madison Avenue

- Toledo, Ohio 43652

Gentlemen:

informing us of the

3

Thank you for your letter dated June 29, 197 ,f noncompliance which we

steps you have taken to correct the items o

We

31, 1973.

brought to your attention in our letter dated May

inspection.

will examine these matters during our next

6/73-02, referenced in our

'~

A copy of RO Inspection Report No. 050-34In accordance with Section

)

letter of May 31, 1973, is enclosed.

il

10, Code of

2.790 of the AEC's " Rules of Practice," Part 2, T t e

letter of May 31,

Federal Regulations, a copy of this letter, ourenclosed inspection

29, 1973, and the

If the

Document Room.

1973, your letter of June

report will be placed in the AEC's Public

or your contractors

inspection report contains information which you

written

h

ou submit a

believe to be proprietary, it is necessary t at y20 days of the date of this

hheld from public disclosure.

application to this office, within

identify the basis for

requesting that such information be witIf such an app

The application should

identified is contained in

ietary.

which information is claimed to be proprbe prepared s

the application will also be

a separate part of the application, sinceIf we do not receive an applica

therwise contacted within thend the p

placed in the Public Document Room.

to withhold information, or are not o

specified time period, the enclosed report aletters w

Room.

.

\\

i

j,^-

-

.

g

,3

,

>

'

_

'

s

8001270 Og7

0

.

.

-- .

.

-

_ . - .

. -

- ..- - . -

-

!

l

i

$

1

-

i

.

!

2-

July 9, 1973

Toledo Edison Company

-

-

Unless you wish to make application to withhold information, no reply

to this letter is necessary; however, should you have questions con-

cerning the enclosed inspection report, we will be glad to discuss

them with you,

,

i

Sincerely yours,

!

.

Boyce H. Grier

,

Regional Director

Enclosure:

>

RO Inspection Rpt No. 050-346/73-02

i

bec w/1tr dtd June 29, 1973:

RO Chief, FS&EB

RO:HQ (4)

,

j

Licensing (4)

DR Central Files

j

Regions I & II

PDR

i

Local PDR

NSIC

j

DTIE

.

O

l

6

l

i

-

$

l

1

s

,

,

---,n.-

.,-

,----,--,n-

- - - - - ,- , , , , - - , , ,

,--m--,

nw,

-,- , . , - .--_.m,--

, ,

--m,

, , , , - , , ,- - - , - .

.,,--,._,.,,_aw.

, -,

._m.,w,y

--m.--y---y