Forwards IE Insp Rept 50-346/75-19 on 751022-23. Noncompliance Noted
ML19319B429
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/04/1975
From: Jordon E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B427 List:
References
NUDOCS 8001150998
Download: ML19319B429 (2)


See also: IR 05000346/1975019

Text

___

_.

______

.

-

.s

~

IE FILE COPY.

.. -

>

.

UNITED STATES

i

-

NUCl. EAR REGULATORY COMMISSION

REGION til

-

799 ROOSEVELT ROAO

GLEN ELLYN. ILLINOIS 60137

NOV

4 1975

Toledo Edison Company

Docket No. 50-346

ATIN: 'Mr. Lowell Roe

Vica President Facilities

'

Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

This refers to the inspection e ducte1 ty Mr. R. Martin of this

office on October 22-23, 197; d vetivities at Davis-Besse

Unit 1 Construction Site, autu _acd by NRC Construction Permit

No. CPPR-80 and to the discussion of our findings with Mr. J.

Evans and others of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identi-

fies the areas evamined during the inspection. Within these

areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with plant

personnel, and observations by the inspectors.

,

During this inspection, it was found that certain of your

activities appear to be in noncompliance with NRC requirements.

The items and reference to the pertinent requirements are

listed under Enforcement Action in the Summary of Findings

section of the enclosed inspection report.

-

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 re-

quires you to submit to this office within twenty days of

your receipt of this notice, a written statement or explana-

tion in reply, including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective

l

nteps which will be taken to avoid further items of noncom-

pliance; and (3) the date when full compliance will be

achieved.

Such a statement or explanation should be provided

for each of the items listed.

!

[Nv)

\\

01#

s0

J

..

m

,

.

.

\\

.

Toledo Edison Company

-2-

NOV

4 1975

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this notice, the enclosed inspection report, and your

response to this notice will be placed in the NRC's Public

Document Room. If this report contains any information that

you or your contractors believe to be proprietary, it is

necessary that you make a written application to this office,

within twenty ' days of your receipt of this notir.e. to with-

hold such information from public disclosure. Any such

application nust include a full statement of the reasons for

which it is claimad that the information is proprietary, and

should be prepared so the proprietary information identified

in the application is contained in a separate part of t*\\e

document. Unless we receive an application to withhold in-

formation or are otherwise contacted within the specified

time period, the written materini identified L.t this para-

graph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we

will be glad to discuss them with you.

\\

'

Sincerely yours,

E. L. Jordan, Acting Chief

Reactor Operations Branch

Enclosure:

IE Inspection Rpt No. 050-346/75-19