NUCLEAR REGULATORY COMMISSION
REGION lli
CLEN ELLYN. ILLINOt5 60937
<
l> E C 1G im
'
Toledo Edison Company
Docket No. 50-346
ATTNt Mr. Lowell E. Roe
>
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo Ohio
43652
Gentlemen
This refers to the inspection conducted by Messrs. Sutton and
Key of this office on November 19-21, 1975, of activities at
Davis-Besse Nuclear Power Station Unit I authorized by NRC
Construction Permit No. CPPR-80 and to the discussion of our
findings with Mr. Willi
on, you and others of your staff
at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identi-
fies the areas
====4==d during the iaspection. Within these
areas, the inspection consisted of a selective examination of
procedures and representative records, interviews with plant
personnel, and observations by the inspectors.
During this inspection, it was found that certain of your
activities appear to be in noncompliance with NRC require-
meats. The item and reference to the pertinent requif #Rs
are listed under Enforcement Action in the Susanary e
T. a-
ings section of the enclosed inspection report.
This notice is sent to you pursuant to the provisiona
.
Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10 Code of Federal Regulations.
Section 2.201 re-
quires you to submit to this office within thirty days of
your receipt of this notice, a written stacament or explana-
tion in reply, inel= ling
(1) corrective steps which have
been taken by you, and the results achieved; (2) corrective
steps which will be t kaa to avoid further items of noncour-
p11mnres and (3) the date when full comp 11 mare will be
achieved.
..
,y
s 1'
' ~
- . , ' .
-
., . p f
-
9001150 k7
,
i
-
-
. -
. _ _ _ - .
-__
._.
_ .-
.
.
\\
UEC 1C hi;
Toledo Edison Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10 Code of Federal Regulations, a
copy of this notica, the enclosed inspection report, and your
response to this notice will be p1=ead in the NRC's Public
Document Roem.
If this report contains any information that
you er your contractors believe to be proprietary, it is
necessary that you make a written application to this office,
within twenty days of your receipt of this notica, to with-
hold such information from public dimelamure. Any such
application must include a full statement of the reasons for
which it is elmi==d that the information is propriatary, and
should be prepared so the proprietary information identified
in the application is contain=d in a separate part of the
document. Unless va receive an application to withhold in-
formation or are otherwise contacted within the specified
time period, the written material identified in this para-
graph will be placed in the Public Daet==nt Roca.
Should you have any questions ennemening this inspection, we
will be glad to discuss them with you.
Sincerely yours,
i
D. M. Hunnicutt, Chief
Raactor Construction and
En=4 - eing Support Branch
Enclosuret
IE Inspection Report
No. 050-344/75-21
bec w/ enc 1:
PDE
Local PDE
U. Young Park, Power
Siting Commission
O
,
1