Forwards IE Insp Rept 50-346/75-21 on 751119-21. Noncompliance Noted
ML19319B415
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/10/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B371 List:
References
NUDOCS 8001150987
Download: ML19319B415 (2)


See also: IR 05000346/1975021

Text

_ _

_ - .

.

. _ _ . .

_

-

- -

-- -

_

l

l

a

O

.

IE FILE COPX

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

REGION lli

799 ROOSEVELT RO AD

CLEN ELLYN. ILLINOt5 60937

<

l> E C 1G im

'

Toledo Edison Company

Docket No. 50-346

ATTNt Mr. Lowell E. Roe

>

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo Ohio

43652

Gentlemen

This refers to the inspection conducted by Messrs. Sutton and

Key of this office on November 19-21, 1975, of activities at

Davis-Besse Nuclear Power Station Unit I authorized by NRC

Construction Permit No. CPPR-80 and to the discussion of our

findings with Mr. Willi

on, you and others of your staff

at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identi-

fies the areas

====4==d during the iaspection. Within these

areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with plant

personnel, and observations by the inspectors.

During this inspection, it was found that certain of your

activities appear to be in noncompliance with NRC require-

meats. The item and reference to the pertinent requif #Rs

are listed under Enforcement Action in the Susanary e

T. a-

ings section of the enclosed inspection report.

This notice is sent to you pursuant to the provisiona

.

Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10 Code of Federal Regulations.

Section 2.201 re-

quires you to submit to this office within thirty days of

your receipt of this notice, a written stacament or explana-

tion in reply, inel= ling

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective

steps which will be t kaa to avoid further items of noncour-

p11mnres and (3) the date when full comp 11 mare will be

achieved.

..

,y

s 1'

' ~

- . , ' .

-

., . p f

-

9001150 k7

,

i

-

-

. -

. _ _ _ - .

-__

._.

_ .-

.

.

\\

UEC 1C hi;

Toledo Edison Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10 Code of Federal Regulations, a

copy of this notica, the enclosed inspection report, and your

response to this notice will be p1=ead in the NRC's Public

Document Roem.

If this report contains any information that

you er your contractors believe to be proprietary, it is

necessary that you make a written application to this office,

within twenty days of your receipt of this notica, to with-

hold such information from public dimelamure. Any such

application must include a full statement of the reasons for

which it is elmi==d that the information is propriatary, and

should be prepared so the proprietary information identified

in the application is contain=d in a separate part of the

document. Unless va receive an application to withhold in-

formation or are otherwise contacted within the specified

time period, the written material identified in this para-

graph will be placed in the Public Daet==nt Roca.

Should you have any questions ennemening this inspection, we

will be glad to discuss them with you.

Sincerely yours,

i

D. M. Hunnicutt, Chief

Raactor Construction and

En=4 - eing Support Branch

Enclosuret

IE Inspection Report

No. 050-344/75-21

bec w/ enc 1:

PDE

Local PDE

NSIC