Text
O
K/
.
-
- .
4
'
UNITED STATES
"
NUCLEAR REGULATORY COMMISSION
REGION til
GLEN ELLYN, ILLINOIS 60137
AUG
5 1975
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell Roe
n
DI'
D
Vice President, Power
b
Edison Plaza
i
-
300 Madison Avenue
m
Toledo, Chio 43652
0
g-
-
v
]
Centlemen:
This refers to the investir;ation conducted by Mr. Jablonnki of this
office on June 4, 1975, concerning electrical installations alleged
to be in noncomformance with good work practices at Davis-Besse Unit
1 authorized by NRC Construction Pernit No. CPPR-80 and to the
discussion of our findings with you and others of your staff on
June 12, 1975.
A copy of our report of this investigation in enclosed and identifies
(Ov)
investigation consisted of a selec.19e era:nination of procedures and
the areas examined during the inven'igation. Within thene areas, the
representative records, tuterviews with plant personnel, and observations
by the inspector.
During this investigation, it was found that certain of your activities
appear to be in noncompliance with MRC requirements. The item and
reference to the pertinent requirements are listed under Infractions in the
Suwoary of Fsets Section of the enclosed investigation report.
This notice is sent to you pursuant to the provisions or Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice. a written statemnt or
explanation in reply, including:
(1) corrective stens which have been
taken by ynu, and the results achieved; (2) corrective steps which will
be taken to avoid further items of noncompliance; and (3) the date when
full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice will be
D
obuT g
%
C
lCIC
d
S
IIC '
6
$
~~~~~'"
r
4
8001150 g
- re a'*
-. _ _ _ -
-. _ _
_ _ _________________.
,
' ' , '
5 1975
'
Toledo Edison Company
-2-
placed in the NRC's Public Document Room.
If this report contains any
information that you or your contractors believe to be proprietary, it
is necessary that you make a written application to this office, within
twenty days of your receipt of this notice, to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons for which it is claimed that the information is proprietary,
and should be prepared so the proprietary information identified in the
application is contained in a separate part of the document. Unless we
receive an application to withhold information or are otherwise contacted
within the specified time period, the written material identified in
this paragraph will be placed in the Public Document Room.
Should you have any questions concerning this investigation, we will be
glad to discuss them with you.
Sincerely yours,
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
Enclosure:
,
IE Investigation Rpt No.
050-346/75-10