Forwards IE Insp Rept 50-346/75-11 on 750618 & 19. No Noncompliance Noted
ML19319B381
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/09/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B382 List:
References
NUDOCS 8001150961
Download: ML19319B381 (2)


See also: IR 05000346/1975011

Text

<

-

I

A

o

UNITED STATES

4

,

NUCLEAR REGULATORY COMMISI!ON

REGION lit

7M ROOSEVELT RO AD

I

GLEN ELLYN, ILLINOIS 60137

JUL

'9 1975

Toledo Edison Company

Docket No. 50-346

ATTN: Mr. Lowell d. Roe

,

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Masers. Miller and Greger of

this office on June 18 and 19, 1975 of activities at the Dwis-Basse

Nue1ame Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-80

and to the discussion of our findings with Mr. Evans and others of your

staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

S

areas awamined during the inspection. Within these areas, the inspection

consisted of a selective avamination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

No itama of noncomp14mnee with NRC requirements were identified v thin

the scope of this inspection.

l

In accordanea with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

,

Room. If this report conenina any information that you or your contractors

believe to be proprietary, it is necessary that you make a written

application to this office, within twenty days of your receipt of this

lecter, to withhold such information from r blic disclosure. Any such

application must include a full statement J the reasons for which it is

claimad that the information is proprietary, and should be prepared so

the proprietary information identified in the application is contained

in a separate part of the document. Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written material identified in this paragraph will be

placed in the Public Document Roon.

l

0%.UTIO4

4h

O

?

E

dV

5

%

$

l

re a#

8C

i50

9

.

. . _

- _ - _ _ . - -

_.-

- - - . _ - - -

-. _ .- - .-

- _ - - _ . . . _ - .

- .

_

.

j

--

..

.

,.

i

r

I

!@

i

i

l

l

JUL'

'S 1975

l

Toledo Edison Company

-2-

1

l

No reply to this letter is necessary; however, should you havo any

questions concerning this inspection, we will be glad to dist:uss them

j

j

with you.

I

Sincerely yours,

1

I

i

l

Gaston Fiorelli, Chief

1

Reactor Operations Branch

,

I

Enclosure:

)

IE Inspection Report

No. 050-346/75-11

,

!,

bec w/ encl:

!

PDR

I

Local PDR

NSIC

TIC

1

l

4

k

$.

i

i

!

i

1

i

l

i

! O

-

-