ML19319B381
| ML19319B381 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/09/1975 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B382 | List: |
| References | |
| NUDOCS 8001150961 | |
| Download: ML19319B381 (2) | |
See also: IR 05000346/1975011
Text
<
-
I
A
o
UNITED STATES
4
,
NUCLEAR REGULATORY COMMISI!ON
REGION lit
I
GLEN ELLYN, ILLINOIS 60137
JUL
'9 1975
Toledo Edison Company
Docket No. 50-346
ATTN: Mr. Lowell d. Roe
,
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
This refers to the inspection conducted by Masers. Miller and Greger of
this office on June 18 and 19, 1975 of activities at the Dwis-Basse
Nue1ame Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-80
and to the discussion of our findings with Mr. Evans and others of your
staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
S
areas awamined during the inspection. Within these areas, the inspection
consisted of a selective avamination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
No itama of noncomp14mnee with NRC requirements were identified v thin
the scope of this inspection.
l
In accordanea with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
,
Room. If this report conenina any information that you or your contractors
believe to be proprietary, it is necessary that you make a written
application to this office, within twenty days of your receipt of this
lecter, to withhold such information from r blic disclosure. Any such
application must include a full statement J the reasons for which it is
claimad that the information is proprietary, and should be prepared so
the proprietary information identified in the application is contained
in a separate part of the document. Unless we receive an application to
withhold information or are otherwise contacted within the specified
time period, the written material identified in this paragraph will be
placed in the Public Document Roon.
l
0%.UTIO4
4h
O
?
E
dV
5
%
$
l
re a#
8C
i50
9
.
. . _
- _ - _ _ . - -
_.-
- - - . _ - - -
-. _ .- - .-
- _ - - _ . . . _ - .
- .
_
.
j
--
..
.
,.
i
r
I
!@
i
i
l
l
JUL'
'S 1975
l
Toledo Edison Company
-2-
1
l
No reply to this letter is necessary; however, should you havo any
questions concerning this inspection, we will be glad to dist:uss them
j
j
with you.
I
Sincerely yours,
1
I
i
l
Gaston Fiorelli, Chief
1
Reactor Operations Branch
,
I
Enclosure:
)
IE Inspection Report
No. 050-346/75-11
,
!,
bec w/ encl:
!
I
Local PDR
1
l
4
k
$.
i
i
!
i
1
i
l
i
! O
-
-