ML19319B259
| ML19319B259 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/14/1972 |
| From: | Maccary R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319B260 | List: |
| References | |
| NUDOCS 8001140568 | |
| Download: ML19319B259 (1) | |
Text
_
Dic bution:
Docket Filo (50-270/287)
L:TR SEB RF G. Arndt e
SEP 141972 Docket Mos. 50-270/287.
Richard C. DeYoung, Assistant Director for Pressurized Water Reactors Directorate of Licensing DUKE P'0WER COMPRiY, OC0!:EE NUCLEAR POUER PLANT UNITS 2 NiD 3, ACRS INPUT FROM FSAR REVIEW kid EVALUATION Plant Name: - Oconee Nuclear Power Plant Units 2 and 3
' Licensing Stage: FSAR-OL-Revicv-ACRS Report-Docket Numbers:- 50-270, 50-267
,_ Requested Completion Date: N/A PWR f4, I. Peltier
, Responsible Branch.and Project Fanager:
~
Applicant's' response date necessary for completion of next action s
planned ou project: N/A' Description of Response: Coraplete Reticy Status:
Complete The FSAR material submitted by the' applicant has been reviewed and evaluated by the Structural Engineering Branch. An evaluntion of the inforuation'is enclosed to'scrve'as~ input to the ACRS report.
The review and evaluation are based on information provided by the applicant through Amendment No. 21. dated July. 26, 1972, and the Structural Engineering Branch found that the infomation presented in the document is in general adequate.
R. R. Maccary, Assistant Director for Engineering Directorate of Licensing
Enclosure:
ACRS Report Input cc v/o encl:..
cc v/ enc 1:
A. Giambusso, L S. Danauer, DRTA W.
'cDonald, L J. Hendrie, L A. Schwencer, L L. Shao, L I. Peltier, L F. Schauer, L
-, w L:SEBM L:SEB bi Ap.;, _
//J-n- 'S
' N) '
bh
.FScb h sw LShao
- R.acca
@C
,,. p
. summer > ; g,.7341 --
s,
-7 9 [/,[,72_:,, _,,,,_ _ _,, _L Sp4Q W Q -
Adal h,[jfd/12;,I_,,,,,9/jg/,721
- . y ABC.ge tRev,.94 ABCM,0He.
}* u s,mmEt,eem.tesa ; t n -
r4 Of[ ~ ^
a c'
O