ML19319A966

From kanterella
Jump to navigation Jump to search
Requests Info Re Radwaste Sys Configuration,Performance & Other Parameters to Facilitate ETS Review
ML19319A966
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/20/1975
From: Dicker G
Office of Nuclear Reactor Regulation
To: Thies A
DUKE POWER CO.
References
NUDOCS 7912300273
Download: ML19319A966 (1)


Text

_

4 l

,u.

TRIBUTION:

cket(ENVIRON)2

'l D

l NRCPDR I

^

.,r/

Lccal PDR

{

N NRR Reading i

. @ f0 EP-2 Reading I

icker PKreutzer Docket Nos. 50-269 JLee and W 270 1

l Duke Power Company A. C. Thies

- ATTN:

Senior Vice President l

Production and Transmission 422 South Church Street28201 Charlotte, North Carolina i

tings between the staff Gentlemen:

It is our understanding through a series of meeStation's interim and licensee that the Oconee Nuclear Power installation after en Wasta System would be modified to a pemane f

d I

The Coasnission's staff is presently reviewing a areas requiring Specifications (ETS) for operating plants to as to a standard format f

changes to improve and _ update the ETS to con om i

i l details is requested that the licensea. provide pertinent-techn ca and viable requimments.

and other parameters

}

concerning the system configuration, performancei sion by Marc I

of the pemanent Radwater. System to the Conm sMr. Mark Au, P Should you have any questions, please contac (301)443-6970.

Sincerely, Or%inalsigned by Gordon K. Dicker

~

Gordon K. Dicker, Chief Environmental Projects Branch 2 Division of Reactor Licensing Conner Mr. Troy B.

Conner, Hadlock & Knotts Mr. William L. Porter 1747 Pennsylvania Ave., N.W.

cc:

Duke Power Company j

20006 Dod

P. O. Box 2178 Suite 1050 Washington,D.C.

422 SoJth Church Street28201 LM

Charlotte North Carolina

%,g,y gy g,

g 7912300 273 p a.,,,

h,ggy.

gaphen ws M

./,,eh w A-..'%w' A

-h

-