ML19319A711

From kanterella
Jump to navigation Jump to search
Responds to 740313 Request.Forwards Waiver to Tech Spec 3.5.2.5-e Re Control Rod Positions for 24-h Period to Permit Check on x-core Vs Incore Correlation.Waiver Allowed Provided Conditions Met
ML19319A711
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/13/1974
From: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
To: Thies A
DUKE POWER CO.
References
NUDOCS 7911270739
Download: ML19319A711 (2)


Text

_ _ _ _ _ _ _ __ _ _ _ - _ __

l 3>

'f p

K7.6 %/.LW 2-3. _LIC/gl.2x1 _...LTADLh 2.

...... _.. _hW,

\\ Q.

(\\j Tl[' ff(f I APelt hr:cjb ASchwencer VAMoor sumut >

-- D*? >

k ! E l= N : -

?-=== :bb!=YN==

,.. u c-,. ~.. =.sy m m m y.

~

s UNITED STATES ATOMIC ENERGY COMMISSION WAIVER-TO TECHNICAL SPECIFICATIONS DOCKET NO. 50-269

.OCONEE NUCLEAR STATION, UNIT 1 MAR 1 3 II4

Background

on March 13, 1974, Duke Power requested a waiver to the Technical

. Specification 3.5.2.5-e,." Control Rod Position", for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> starting at W dnight March 13, 1974. The purpose of the waiver is-to permit calibration of x-core detectors which due to

.an oversight in the wording of the existing Technical Specifications could not be done without exceeding power imbalance limits.

Evaluation & Conclusion This waiver was reviewed and granted before on November 22, 1973, and the finding and conclusions are contained in the record. The health and safety of the public is not endangered by this temporary waiver and, therefore, the waiver has been' granted.

(See Docket No. 50-270,

. January 7, 1974.)

+

c h,')

^

+

I. A. Peltier, Project Manager Light Water Reactors Branch 2-3.

Directorate of Licensing

  1. 6'GGh'Q A.

chwencer, Chief Light Water Reactors Branch 2-3 Directorate of Licensing i

POORORIGIN$t P-r

-