FNP-2-EOP-15.0 June 4, 1980
(, g Revision 0 FARLEY NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE FNP-2-EOP-15.0 S
A F
E T
Y ANTICIPATED TRANSIENTS WITHOUT TRIP (ATWT) f(
R E
L A'
T UNCONTROLLED COPY.
E CAUTION
~
maintained Current. D Safety Related Activity.
Approved:
Operations Superint hdent Date Issued:
- 2. 3,
Q k.
A Diskette EOP-3
'8001080 h.h
REVISION NO. O l9 PAGE NO.
0 1
2 3
4 5
26 7
8 10 11 j (
1 X
2 X
I 1-C t
w ee (w"
n
5 FNP-2-EOP-15.0 FARLEY NUCLEAR PLANT UNIT 2
(.
EMERGENCY OPERATING PROCEDURE EOP-15.0 ANTICIPATED TRANSIENTS WITHOUT TRIP (HEWT) 1.0 Purpose This procedure provides guidelines for operator action in the event a reactor trip and/or turbine trip does not occur following an automatic trip signal.
2.0 Symptoms 2.1 Failure to obtain a reactor trip following an automatic reactor trip signal.
2.2 Failure to obtain a turbine trip following an automatic turbine trip signal.
3.0 Automatic Actions None 4.0 Immediate Operator Actions j-('
4.1 If a reactor trip does not occur following an automatic reactor trip signal then:
4.1.1 Attempt to manually trip the reactor from the Main Control Board.
If not successful, then:
4.1.2 Momemtarily de-energize load center 2D and 2E.
CAUTION Load centers 2D and 2E should be re-energized immediately and all necessary loads should be restarted.
4.2 If a turbine trip has not occurred following an automat c turbine trip signal, 4.2.1 Attempt to manually trip the turbine from the Main Control Board.
If the turbine does not trip, then:
4.2.2 De-energize the E.H. Pumps 2A & 2B from the Main Control Board.
Start all available auxiliary feed pumps and
{
throttle as necessary to maintain S/G level in the narrow range.
If a turbine trip has not occurred, then:
1 Rev. O
.I
ENP-2-EOP-15.0 4.2.3 Close the MSIV's.
l
(
5.0 Subsequent Ooerator Actions 5.1 If a reactor trip is not forthcoming after immediate action, then:
Go to local panel and manually open and rack out Reactor trip breakers and Reactor trip bypass breaker and flush the Boron Injection Tank to the Primary System as follows:
5.1.1 Stop the BIT Recirc Pumps 2A & 2B.
5.1.2 Close BIT Recirc Pmps to BIT Iso Vlv CVC-HV-8942.
5.1.3 Close BIT to BIT Recirc Pump Iso CVC-HV-8945A and CVC-HV-8945B.
5.1.4 Open Boron Injection Tank outlet valves CVC-MOV-8801A and CVC-MOV-8801B.
5.1.5 Open Boron Injection Tank inlet iso CVC-MOV-8803A and CVC-MOV-8803B.
5.2 If following an automatic turbine trip signal,
, i.
the turbine does not trip and causes an'-uncontrolled l
cooldown, emergency borate in accordance with EOP-6.0.
5.3 When a reactor trip does occur, refer to EOP-5.0.
5.4 When a turbine trip does occur, refer to AOP-3.0.
5.5 If a safety injection signal occurs, refer to EOP-0.
d 2
Rev. 0
...