Abnormal Operating Procedure, Loss of Main Feedwater, Vol 5,Revision 0
ML19318D231
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/30/1980
From:
ALABAMA POWER CO.
To:
Shared Package
ML19318D229 List:
References
FNP-2-AOP-13.0, NUDOCS 8007080228
Download: ML19318D231 (4)


Text

.

1 VOLUME 5 FNP-2-AOP-13.0 May 30, 1980

  • l

(-

Revision 0 FARLEY NUCLEAR PLANT ABNORMAL OPERATING PROCEDURE FNP-2-AOP-13.0 S

A F

E T

Y LOS'S OF MAIN FEEDWATER E

L^

UNCONTROLLED COPY CAUT10N: w. =n i= =t o

rnalntained Current. Do not use in a Safety Related Activity.,

i l

Approved:

0

  1. f/pJcv Operations Superintendent 4/0 Date Issued:

L-4 Diskette AOr 2 B 0070 8 0 4

^

LIST OF u::.CTIE PAGES FNP-2-AOP-13.0 e

REVISION NO.

l i

l l2 l

l 1

i l

l8 l

1 IPAGE NO.

I O I 1 13 1 4 15

'6 I 7 9

11 0 11 1 C

e 1

X l

i l

l t

2 x

i t

I i

T l

i I

I

VOLUME 5 FNP-2-AOP-13.0 FARLEY NUCLEAR PLANT UNIT 2

(~

ABNORMAL OPERATING PROCEDURE AOP-13.0 LOSS OF MAIN FEEDWATER 1.0 Purcose This procedure provides Symptoms, Automatic Actions, Immediate Operator Actions and Subsequent Operator Actions required for a loss of main feedwater.

2.0 Symptoms _

Alarm or indication of the following condition'(s) on all steam generators:

2.1 Steam generator steam flow greater than feed flow.

2.2 Steam generator level deviation (t 5% of programmed level).

2.3 Steam generator water level low alert (25%).

3.0 Automatic Actions

.p.

y 3.1 Motor driven auxiliary feedwater pumps.atart if:

Both main feed'ater pumps trip, or 3.1.1 w

3.1.2 On low-low steam generator level, signal in 1/3 steam generators.

3.2 Turbine driven auxiliary feedwater pump starts on low-low steam generator level signal in 2/3 steam generators.

3.3 Reactor trip on steam generator feedwater low flow with S/G level low.

4.0 Lmmediate Operator Actions 4.1 Trip the turbine.

4.2 Verify auxiliary feedwater pumps start.

4.3 Verify reactor trip (Refer to EOP 5.0, Reactor Trip).

k.

A 1

Rev. 0

VOLUME 5 FNP-2-AOP-13.0 5.0 subsequent Operator Action 5.1 Control AFW flow to establish steam generator level at 33 2 5%.

Limit feedwater flow rate to 0

avoid RCS cooldown below 545 F.

NOTE:

If the condensate storage tank level decreases to four (4) feet and auxiliary feedwater is required for plant conditions, shift auxiliary feedwater pumps suction to the service water system per FHP-2-SOP-22.0, Section 4.3.

~

O i-c C

4 2

Rev. O