05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance

From kanterella
(Redirected from ML19318D052)
Jump to navigation Jump to search
/03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance
ML19318D052
Person / Time
Site: Oyster Creek
Issue date: 06/27/1980
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19318D047 List:
References
LER-80-024-03L, LER-80-24-3L, NUDOCS 8007070265
Download: ML19318D052 (3)


LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance
Event date:
Report date:
2191980017R00 - NRC Website

text

._

MC P CKM 366 U. S. NUCLEAR REGULATGRY COMMI,55 TON O

(1 17)

LICENSEE EVENT REPORT CONTROL BLOCK: l 'I l

l l

1 Ih (PLEASE PRINT OR TYPE ALL REQUIREO INPORMATION) 1 6

lo I s l l N I J l 0 l C l P l I l@15 0l 0l -l 0 l 0 l Ol 01 0 l - l 0 l O l@26klIlIlIl1l@

l l@

7 8 !!

LICEr454E COOE 14 L.C 5 NSE NVM8tR 26 LaCENSE TYPE JO 61 CAT 54

)

CON'T E I L l@l 01 51 01 01 01 21 11 91@l 01 cil 21 o l a l o l@l n l A l e l 71 a l n l@)

Iol11 8

60 43 OOCKET NUMsER 68 69 EVENT CATE 74 7S REPOAT DATE 80 EVEN T DES,CRIPTION ANO PROBAOLE CONSEQUENCES h 1

I 101:1 l Durina the Investiaation of LER 80-17/IT. It was discovered that the surv-

\\

ITTTl !

el11ance requirements for the "one rod free travel interlock" was not I

lo141l performed on a daily basis as reauired in T.s.4.9.D.1.

The surveillance I

!o isI i of concern was performed prior 'to fuel handlino and week 1v thereafter in I

1 1C se ! i accordance with T.S.4.9.A.. when fuel was beino handlea.

The Interinek l

10!7i i was oroven oDerable throuahout the entire refuel ino oeriod bv n erform-I io is i l ance of the reaut rements of the latter sDecification.

I

)

80 i

g e SYSTEM

CAUSE

CAUSE COMP.

VALVE 0000 COOE SUSCOOE COf.tPCNENT COOE SUSCOOE SUSCOOE loi91 la is l@ IA l@ l X l@ l Z l Z l Z l Z l Z l Z l@ l,_Zj@ l_Zj @

7 5

3 to 11 12 13 13 19 20 l

SEQUENTIAL CCCURRENCE REPORT REVISION -

, EVENT YEAR REPORT NO.

CODE TYPE NQ.

@ LEs no 18101 1-1 1012141 1/1 10 13 I I ti 1-1 Lo_I tl,g q

21 22 23 24 26 27 28 29 30 31 32 N AC 0 Pt NT MET HOURS 5g i PCR 3.

U Lt MA RER IZl@lxi@

l Z i@

IZi@

101010101 lY l@

IN l@

l Z l@

lZ191919!@

03 34 35 as 37 40 41 42 43 44 47 CAUSE OESCRIPTICN AND CORRECTIVE ACTIONS @

l1Iol l The reautred surveillance was nnt nn the Maccar <nev illane. tek. ant.

I t

I L' L' J I (Mss). nor was a orne.aure nrnuta.a Snr te. n.rrmemme,.

ati

..t t.y m1 Tech SOcc surveillance' item < will he ninc.a nn eh. Mce. nrne.anr.. m:11 A.

I g j prepared for all items; and a method will be provided for ensuring l

3 A I

that new requirements are incorporated on the MSS and into procedures.

l

- 7 s9 ao

'sTA

% POWER QTHER STATUS is Y

DISCQYERY DESCRIPTION

[ ZJ@ l 0 l 0 l 0 l@l NA l

l C l@l During the investigation of another eveint i s t

A$nviTY CST 1NT 7

AMoUNToP ACriviry @ I LOCATION CP RELEASE @

fits'l L ZJ @o oP RELEAstLZ.J@l REttAsE NA l

NA l

PERSONNEL ExPosuits DESCRIPTION @

NuMeER TYPE

[ TIT] l 0l 0l Ol@l Zl@l NA l

a0

' PEasoNNE'L iN;Ults NUMSE R CESCRIPTICn frTTI 101010 l@l NA l

1 8 9 11 - 12 80 LOSS OP QR CAMAGE TO FACILITV

. TvPE @l DESCRIPTION y

NA l

1 9 7

8 9 10 50 essutf@ DESCRIPTION Weekl.y News Release l

llllllllllll l{

e ly l

l210l s

8 9 to 68 69 go.;

ss 455-8784 2

NAME OP PREPARER..-

PHONE:

2

Jersey Central Power & Light Company Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Reportable Occurrence No. 50-219/80-24/3L Report Date June 27, 1980 Date of Occurrence May 20, 1980 identification of Occurrence Violation of the Technical Specifications, paragraph 4.9.D.1, wherein the "one rod free movement interlock" surveillance requirement was not performed daily as required.

This event is considered to be a reportable occurrence as defined in the Tech-nical Specifications, paragraph 6.9.2.b.3 Conditions Prior to Occurrence The plant was shutdown for a refueling / maintenance outage.

Moderator Temperature, <212*F Rea ctor Pressure, Atmospheric Description of Occurrence During the Investigation of LER 80-17/1T It was discovered that the surveillance requirements for the "one rod free travel interlock" was not performed on a daily basis as required in Technical Specification 4.9.D.I.

The survelliance described was performed prior to fuel handling and weekly thereafter in accordance with Technical Specification 4.9.A, when fuel was being handled. The interlock was proven operable throughout the entire refueling period by perfornance of the requirement of the latter specification.

Apparent C3use of Occurrence Tn' cause of this occurrence is attributed to personnel error.

Failure to per-e form the surveillance is attributed to the failure to include it on the Master Surveillance Schedule and failure to provide a procedure for its performance.

?

Jersey Central Power & Light Company is a Mernber of the General Pubic Utdities Systern

+~MDMe<h.w w

,e=

e-swm

.mee e g--.-,e--mm--Om--y-+-

- g

=w

+em,e

  • .-e,,-e a-e,--h.immye m-emh-w#e.

m.

Reportable Occurrence No. 50-219/80-24/3L

.Page 2 June 27, 1980 Analysis of Occurrence Even though the surveillance was not performed daily as required, the fulfilled requirements of the Technical Specification 4.9. A surveillance proved the inter-lock to be operable throughout the refueling period. Therefore, multiple rod withdrawal, except as described in LER 80-17, could not have occurred. The safety significance of this event is considered minimal.

It should also be noted that performance of this specific surveillance would not have detected the con ( tions in LER 80-17.

Corrective Action

Since the event was discovered after the completion of refueling activities, no immediate corrective action was required.

Corrective action to prevent a reoccurrence of this type event will consist of (1) Placement of all existing Technical Specification surveillance items on the Master Surveillance Schedule (2) Preparation of procedures for those survell-lances for which procedures do not exist, and (3) Provision for a method of ensuring that new requirements are incorporated on the Master Surveillance Schedule and into procedures.

Failure Data Not applicable.