NOTICE OF VIDLATION Public Service Company of New Hampshire Docket Nos. 50-443 50-444 l
This refers to the inspection conducted by a representative of the Region I
-(Philadelphia) office at the Seabrook Station, Units 1 and 2, Seabrook, New i
Hampthire, of activities authorized by NRC License Nos. CPPR-135 and CPPR-136.
l
.During this inspection, conducted February 26-28, 1980, the following apparent items of noncompliance were identified:
A.
10 CFR 50, Appendix B, Criterion V, states, in part, that:
" Activities affecting quality shall be prescribed by documented instructions, proce-dures, or drawings...and shall be accomplished in accordance with these instructions, procedures, or drawings."
The Seabrook Station PSAR for Units 1 and 2 states, in part, in paragraph 17.1.5 that:
"Each organization is required to perform their respective quality related' activities covered by this program in accordance with documented instructions, procedures or drawings."
i
)
Perini Power Constructors Quality Assurance Procedure QAP 10.14, Revision 1, fcr Stud Weld Inspection, states, in part, in paragraph 5.2 that:
"Inspec-tions shall be performed to assure construction personnel control and install stud welds in accordance with FCCP-157."
Contrary to the above, on February 28, 1J80, no stud welding inspection had been performed on an AP155 embed plate to which studs had been we'Jed at Seabrook Station and for which a nonconforming stud weld condition did exist.
This item is an infraction applicable to Docket No. 50-443.
B.
10 CFR 50, Appendix B, Criterion VI, states, in part, that:
" Measures shall be established to control...rScuments (and) assure that documents, I
including changes, are..distributud...and used..."
The Seabrook Station PSAR for Units 1 and 2 states, in part, in paragraph 17.1.6 that:
"Each organization performing quality related activities covered by this program, including vendors and site constructors, is required to have a document control system. The system shall be defined in written procedures."
Contrary to the above, on February 27, 1980, no measures had been estab-lished in the Perini Power Constructors document control system to assure that engineering changes to governing specifications would be incorporated for use into the applicable Perini procedures.
This item is an infraction applicable to Docket Nos. 50-443 and 50-444.