ML19318B907

From kanterella
Jump to navigation Jump to search
Responds to NRC 800506 Ltr Re Insp on 800326-27.Reg Guide 2.6 Has Been Reviewed & Emergency Plan Will Be Written. Facility Emergency Procedures Have Been Issued w/1979 Revisions Included
ML19318B907
Person / Time
Site: University of Missouri-Columbia
Issue date: 05/29/1980
From: Brugger R
MISSOURI, UNIV. OF, COLUMBIA, MO
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19318B902 List:
References
NUDOCS 8006300275
Download: ML19318B907 (2)


Text

l

?

~

~ Research Reactor Facility UNIVERSITY OF MISSOURI Research Park Colutnbia, Missouri 65211 Telephone (314) 882-4211 May 29, 1980 Mr. James G. Keppler, Director Region III Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

1. Docket 50-186
2. NRC letter dated May 6, 1980 concerning an inspection con-ducted on March 26-27, 1980.

Dear Sir:

As requested in your May 6, 1980 letter, we are informing you of the actions we have taken or plan to take involving the areas of your concerns.

As stated during the inspection, we have reviewed Regulatory Guide 2.6 and plan to write an emergency plan. Currently there is no requirement for us to have an emergency plan, but there will be when the draft rule being reviewed by the Commission is approved. Since we have a ten megawatt research reactor, we will have one year from the effective date of the new rule to submit _

an emergency plan.

The facility emergency procedures have been issued with the 1979 revisions included. The Reactor Manager will insure that future revisions prepared pursuant to his review in conformance -

with Technical Specification requirements are issued in a timely fashion.

The Research Reactor Facility has conducted refresher train-ing covering our facility's emergency procedures in the past

% ma at COLUMBIA KANSAS CITY ROLLA ST. LOUIS 8006300 j

9 Mr. James G. K;ppler, Dir:ctor May 29, 1980 Page 2 whenever the familiarity of the facility's personnel with the procedures indicated the need for review. The facility will continue to handle the refresher training in this manner.

If you need additional clarification, please contact one of us.

Sincerely, James C. McKibben Reactor Manager Endorsement: l .

Reviewed and Approved:

/ ]g kobertM.Brugger Director JCMK:vs W

o 4