Requests Update of Antitrust Info Per Encl Reg Guide 9.3
ML19318B883
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/16/1980
From: Saltzman J
Office of Nuclear Reactor Regulation
To: Wofford A
LONG ISLAND LIGHTING CO.
References
RTR-REGGD-09.003, RTR-REGGD-9.003 NUDOCS 8006300246
Download: ML19318B883 (1)


Text

f'# ~%

{hh

'k UNITED STATES oj' "

g NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20555 5

p

\\ *... + p#

June 16,1980 Docket No. 50-322A S

Mr. Andrew W. Wofford Vice President Long Island Lighting Company 175 East Old Country Road Hicksville, N. Y.

11801 z.

Dear Mr. Wofford:

SHOREHAM NUCLEAR POWER STATION - UNIT 1 In January of 1976 you submitted antitrust information in accordance with AEC Regulatory Guide 9.3.

This information is used in connection with the operating license review of the captioned nuclear plant toward determining if any significant antitrust related changes have occurred subsequent to the previous construction permit antitrust review. As it has now been over four years since your January,1976 submittal, we would appreciate receiving at your earliest convenience an update of the Regulatory Guide 9.3 information.

(Copy of Guide is attached.)

Sincerely.

8,,W J

f Utility Finance Bran.ch Division of Engineering Office of Nuclear fleactor Regulation cc:

J. Wilson (h

sooesoo 2qc

October 1974 r

~

o[c 'G'(

,1 REGULATORY GUIDE a

U.S. ATOMIC ENE~~Y C!MMISSl!']

DIRECTORATE OF REGULATORY STANDARDS

.s.

REGULATORY GUIDE 9.3 INFORMATipN NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS FOR NUCLEAR POWER PLANTS 9

A. INTRODUCTION items and any related changes that have occurred or are planned to occur since submission of the As required by the December 19,1970, amendments construction permit application:

to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to

a. Anticipated excess or shortage in generating construction permits and operating licenses it issues for capacity resources not expected at the construc-commercial nuckar facilities. The Commission must tion permit stage. Reasons for the excess or under certain circumstances, make a finding as to shortage along with data on how the excess will be whether the activities under the permit orlicense would allocated, distributed, or otherwise utilized or how create or maintain a situation inconsistent with the the shortage will be obtained.

antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines b.New power pools or coordinating groups or such review is advisable on the ground that significant changes in structure, activities, policies, practices, changes in the licensee's activities or proposed activities or membership of power pools or coordinating

(

review conducted by the Attomey General and the groups in which the licensee was, is, or will be a have occurred subsequent to the previous antitrust participant.

w.-

Commission at the construction permit stage. This j

regulatory guide identifies the type ofinformation that

c. Changes in transmission with respect to (1) the the Regulatory staff conside s germane for a decision as nuclear plant, (2) interconnections, or (3) to whether a second antitrust review is required at the connections to wholesale customers.

operating license stage.

d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and B. INFORMATION NEEDED BY THE AEC basis for such changes should be incl"ded.

REGULATORY STAFF IN CONNECTION

c. Changes in design, provisions, or conditions of rate WITH ITS ANTITRUST REVIEW schedules and reasons for such changes. Rote OF OPERATING LICENSE APPLICATIONS increases or decreases are not necessary.

FOR NUCLEAR POWER PLANTS

f. List of all (1) new wholesale customers, (2) transfers from one rate schedule to another,
1. To assist the regulatory staff in its review, a including copies of schedules not previously app" cant for a license to operate a commercial furnished, (3) changes in licensee's service area, nuclear power plant should consider the following and (4) licensee's acquisitions or mergers.

USAEC REGULATORY GUIDES copia e, pubs..h.d p+i m., be ob.ined b, e.gwe t ind.c., the 6..on.s desi..d to th. US. Atom.c E ne.gy Comm. won W.shington. Dr,. 20 e,or.

i,,,

m..o. *~,.o, R. gut.,ory si.nd.rd.s. Comm.nt.d ~.e b.

nd upps.ons..,

A,t.ation;

.r.ctor

.m.me,.d.r.io.. ~ n c R.g.,o......n,d,m.t.

..t.bie to.th. publ.g e wed to encastm.

R.gul.cory G

~ s-,e

. ~ com,..on.u.r.d,e..,..,

d o im,ie-..,.

,..~.n,. o.

..d

.d

- b, t,.

.,.,,, o

...om om....ng nd s.

.E n..g. com.n.. w h.,.

. o c. 20s...

,~

~c.o-.on,

..o

.,o d..

e..

on.

. o,,o

. d. g..d.,

.o

('-

  • ",',**'.", 0 *db..me,,.bi....,,.
d.. %,o, ~ n.,,M..". ".fom,. :

','"" tt.L"*.'a;%',T"n,'",,'%'T,*o".,'

Th..... i d i, ~,oi%,en b. -

..so

,....o

~.go go,.,. g,,,,,,,

=,,,,,,

~.

n o,.

,,,m.,b,~c _,~.

m...,d

.... o...

.. om..

..h.,

4. Environmeni.I.nd S ting
9. Ant teus, R..wr.s tornmbs,,5.nd to r.,de b.,evis.d p. red.c. t.,.s opp. ope.. to.ccommod.t.

PW.sh.d pede.

leC1 F9.s inform.t n or.mpe lence.

5. W.t.r. 8s.nd Pi.ni Protectio.i
10. Gener.1 dupe o f M / ipr $u 8
3. Ust cf those generating capacity additions
2. Ucensees whose construction permits include con-committed for operation after the nuclear facihty, ditions pertaining to antitrust aspects should list and

~

including ownership rights or power output discuss those actions or policies which have been

(

allocations.

Implemented in accordance with such conditions.

v

3. Five copies of a separate document entitled

Information for Antitrust Review of Operating

h. Summary of requests or indications of interest by Ucense Application" and containing the above other electric power wholesale or retail dis-requested information should be submitted when the tributors, and licensee's response, for any type of operating license application documents are sub-electric service or cooperative venture or study.

mitted or as soon thereafter as possible.

(

t f

I i

'(

9.3 2

.