Forwards IE Insp Rept 50-364/80-12 on 800506-08.No Noncompliance Noted
ML19318B845
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/22/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19318B843 List:
References
NUDOCS 8006300166
Download: ML19318B845 (2)


See also: IR 05000364/1980012

Text

-

e

e

p nr

[]

-

t

NUCLEAR REGULATORY COMMISSION

%

UNITED STATES

$

,E

REGION 11

,

~#

101 MARIE) TA ST

N.W., SUITE 3100

ATLA

.*A, C:oRGIA 3o3o3

  • ....

% . 2 2 1980

In Reply Refer To:

RII:MDH

50-364/80-12

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on May 6

through 8,1980 of activities authorized by NRC Construction Permit No. CPPR-86

,

for the Joseph M. Farley facility, and to the discussion of our findings held

l

with N. F. Kaup at the conclusion of the inspection.

i

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

'

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

i

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

j

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

0

them with you.

o

Sincerely,

r

,

. 4s

/

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

8006300

.

,

. .

Alabama Power Company

-2-

MAY 2 21980

.

.

Enclosure:

Inspection Report No. 50-364/80-12

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

Post Office Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, AL 35291

W. C. Petty

Manager-Quality Assurance (Design and Construction)

Post Office Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

0. D. Kingsley, Jr.

'

Manager, Nuclear Engineering and

Technical Services

P. O. Box 2641

'

Birmingham, AL 35291

.

l

..

N