ML19318B845
| ML19318B845 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/22/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19318B843 | List: |
| References | |
| NUDOCS 8006300166 | |
| Download: ML19318B845 (2) | |
See also: IR 05000364/1980012
Text
-
e
e
p nr
[]
-
t
NUCLEAR REGULATORY COMMISSION
%
UNITED STATES
$
,E
REGION 11
,
~#
101 MARIE) TA ST
N.W., SUITE 3100
ATLA
.*A, C:oRGIA 3o3o3
- ....
% . 2 2 1980
In Reply Refer To:
RII:MDH
50-364/80-12
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by M. D. Hunt of this office on May 6
through 8,1980 of activities authorized by NRC Construction Permit No. CPPR-86
,
for the Joseph M. Farley facility, and to the discussion of our findings held
l
with N. F. Kaup at the conclusion of the inspection.
i
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
'
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
i
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
j
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
0
them with you.
o
Sincerely,
r
,
. 4s
/
C. E. Murphy, Chie
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
8006300
.
,
. .
Alabama Power Company
-2-
MAY 2 21980
.
.
Enclosure:
Inspection Report No. 50-364/80-12
cc w/ enc 1:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, AL 35291
W. C. Petty
Manager-Quality Assurance (Design and Construction)
Post Office Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
0. D. Kingsley, Jr.
'
Manager, Nuclear Engineering and
Technical Services
P. O. Box 2641
'
Birmingham, AL 35291
.
l
..
N