| Site: | Callaway |
| Issue date: | 05/14/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19318B796 | List: |
| References | |
| NUDOCS 8006300067 | |
| Download: ML19318B795 (2) | |
See also: IR 05000483/1980009
Text
Ilc
l
panouq'o
UNITED STATES
<,7
8$-)
- 'n
NUCLEAR REGULATORY COMMISSION
YE
REGION lil
,
U[
0,
799 ROOSEVELT ROAD
%.....o
GLEN ELLYN,ILLINolS 60137
MAY 14 1980
-
Docket No. 50-483
Union Electric Company
ATTN: Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office on
April 23-24, 1980, of activities at the Callaway Plant, Unit 1, authorized
by NRC Construction Permit No. CPPR-139 and to the discussion of our find-
ings with Mr. M. I. Doyne and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
'
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
'
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office within thirty
days of your receipt of this notice a written statement or explanation in
reply, including for each item of noncompliance:
(1) corrective action
taken and the results achieved; (2) corrective action to be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a full
statement of the reasons for which the i formation is considered proprietary,
and should be prepared so that proprietacy informati ~. identified in the
application is contained in an enclosure to the application.
8006300047
Q
_ _-_ _ _ - -.
_ _ _ _ _ _ _ _ _ _ _
O
Union Electric Company
-2-
fWAY 1 4 GB0
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
!
,
E)
. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Report
No. 50-483/80-09
i
cc w/encls:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
PDR.
Local PDR
Regions I & IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
i
Division, Missouri Public
Service Commission