Forwards IE Insp Rept 50-483/80-09 on 800423-24 & Notice of Violation
ML19318B795
Person / Time
Site: Callaway 
Issue date: 05/14/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19318B796 List:
References
NUDOCS 8006300067
Download: ML19318B795 (2)


See also: IR 05000483/1980009

Text

Ilc

l

panouq'o

UNITED STATES

<,7

8$-)

- 'n

NUCLEAR REGULATORY COMMISSION

YE

REGION lil

,

U[

0,

799 ROOSEVELT ROAD

%.....o

GLEN ELLYN,ILLINolS 60137

MAY 14 1980

-

Docket No. 50-483

Union Electric Company

ATTN: Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office on

April 23-24, 1980, of activities at the Callaway Plant, Unit 1, authorized

by NRC Construction Permit No. CPPR-139 and to the discussion of our find-

ings with Mr. M. I. Doyne and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

'

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

'

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the i formation is considered proprietary,

and should be prepared so that proprietacy informati ~. identified in the

application is contained in an enclosure to the application.

8006300047

Q

_ _-_ _ _ - -.

_ _ _ _ _ _ _ _ _ _ _

O

Union Electric Company

-2-

fWAY 1 4 GB0

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

!

,

E)

. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Report

No. 50-483/80-09

i

cc w/encls:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR.

Local PDR

NSIC

TIC

Regions I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

i

Division, Missouri Public

Service Commission