ML19318B631

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-317/80-04 & 50-318/80-04 on 800317-21 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19318B631
Person / Time
Site: Calvert Cliffs  
Issue date: 05/05/1980
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Evans V
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19318B632 List:
References
NUDOCS 8006270239
Download: ML19318B631 (2)


See also: IR 05000317/1980004

Text

Yh

-

UNITED STATES

pa s s

'

  • o

NUCLEAR REGULATORY Commission

fg

REGION I

y

q

/, g

631 PARK AVENUE

g

f

KING OF PRUSSI A, PENNSYLVANIA 1940.

5 MAY 1980

gv/

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN:

Mr. V. R. Evans

Vice President, General Services

P.O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection Nos. 50-317/80-04 and 50-318/80-04

This refers to the inspection conducted by Mr. R. J. Bailey of this office on

March 17-21, 1980, at Calvert Cliffs Nuclear Power Plants Units 1 and 2, Lusby,

Maryland, of activities authorized by NRC License Nos. DPR-53 and DPR 69 and to

the discussions of our findings held by Mr. Bailey with members of your staff at

the conclusion of the inspection, and to a subsequent telephone discussion between

Messrs. Bailey and Devlin with Mr. C. Steinhagen of your staff on March 27, 1980.

Areas examined during this inspection are described in the ONice of Inspection

and Enforcement Inspection Report which is enclosed witn this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct th~e items of

noncompliance brought to your attention in a letter dated March 30, 1979. We

have no further questiens regarding your action at this time.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you .to submit to

this office, within twenty (20) days of your receipt of this r.otice, a written

statement or explanation in reply includi_ng:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Feceral Regulations, documentation of findings of your control

800627 0M @

l

.

_

.

s

.

Baltimore Gas and Electric Company

2

5 MAY 1980

.

and accounting proceduces for safeguarding special nuclear ma+

ials and your

facility security procedures are ' exempt from disclosure; therefcre, the enclo-

sures to this letter, and your response to this letter will'not be placed in

the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

-

Walter G. Martin, Chief

Safeguards Branch

Enclosures:

Appendix A, Notice of Violation (Con'tains.2.790(d) Info)

Office of Inspection and Enforcement Inspection

Report Nos. 50-317/80-04 and 50-318/80-04

(Contains 2.790(d) Info)

cc:(w/ copy of report cover sheec only)

A. E. Lundvall, Jr., Vice President

L. B. Russell,. Chief Engineer

C. Steinhagen, General Supervisor, Security Services

R. M. Douglass, Manager, Quality Assurance.

T. Sydnor, General Superviser, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

!

l

I

l

l

l

._.

._.

_

_ _ _