AYERAGECAlLY UNIT POWER LEVEL
_}.
a 50-348
~"
DOCKET NO.
(
1 er 6/1/80 DATE COMPLETED BY W. G. Ilairston, III (205) 899-5156 7
TELEPHONE MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net) 808 798 g,
37 811 799 2
gg 798 782' 3
g, 652 807 4
y 622 806 5
21 '
g 806 652 22 806 788 7
y
~
802 800 g
3 806 796 9
25 800 '
799 10 3
' gg 804 796 W.
3' 790 800 12 28 786 804
~'
13 29 804 803 34.
803 792 gg 3g 798 I6 INSTRUCTIONS On this formst. list the average dsity unit power level in MWe-Net for each day in the reporting month. Ccmpute ta the nearest whole megawatt.
~
(9(77)
{
{
l 8006180VR
~
OPERATING DATA REPORT DOCKET NO. 50-348-i DATE 6/1/80 COMPLETED BY
_W. G. Hairston, III
. TELEPHONE (205) 899-5156 OPERATING STATUS I. Unit Name.
Joseph M. Farley - Unit 1 Notes 1/Cumulativ'e ifata trince
~
- 2. Reporting Period: -Mav, 1980 12/1/77, date of commercial
- 3. Licensed ThermalPower (MWr):
2652 operation.
- 4. Nameplate Rating (Gross MWe):
860
/
S. Design Electrical Rating (Net MWe):
- d. Maximum Dependable Capacity (Gross MWe):
e
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occurin Capacity Rstings (Items Number 3 Through 7) Since list Report.Give Reasons:
Maximum Dependable Capacity (Gross MWe and Net MWe) have been determined from operating experience.
.g
- 9. Power Level To Which Restricted,If Any (Net MWe): _N/A q
- 10. Reasons For Restrictions,If Any:
N/A
\\
...,t-,.
w
,~
II. Hours In Reporting Period 744 '
3.647'
'21.911
- 12. Number of Hours Reactor Was Critical 744 3,210.6 14,146.1
{
- 13. Reactor Reserve Shutdown Hours 0-436.4 1,841.7
- 14. Hours Generator On4.Ine 744 3,147.7 13,738.2
- 35. Unit Reserve Shutdown Hours
- 16. Gross Thermal EnerEy Generated (MWH) 1,927,148.2 7,958,932.5_
34,556,946.9 e
- 37. Gross Electrical Energy Generated (MWH) 614,696 2,562,364.. 11,086,402
' IS. Net Electrical EnerEy Cenerated (MWH) 583,600 2,421,222 10,469,402
- 19. Unit Service Factor
.'..2 100.0 86.3 62.7
- 20. Unit Availability Factoe 100.0 86.3 62.7
- 23. Unit Capacity Factor (Using MDC Net) 97.6 82.6 59.5
- 22. Unit Capacity Factor (Using DER Net)
'94;6 80 1.__
97 6,
- 23. Unit Forced Outage Rate 0.0 3.9 6.6 24.' Shutdowns Scheduled OverNext 6 Months (Type.Date.and Durst" ion of Eacht:'
Refueling Outage, Mid September /Early October 1980, approximately 8 weeks'.
C 25, ifs! ut Down At End Of Report Period. Estimated Dare ofStartup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 1
INITIAL CRITICALITY 8/6/77 I
8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77
,..f, N/77)
,__n.
- - ^ *
~
l
.n R
i m
50-348 UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 7* n. Farley - Unitb'i UNIT NAME
"# 'I N DATE W. G. tiairston, III COMPLETED BY TELEPHONE (205) 899-5156 REFORT MONTH May Tee Cause & Corrective
,$ ?
"g
}.{}
License,.
Et,
^ " " ' "
No.
Date k
3g
, ; a:
Event g'g
$5 j;2 g Report #
mO EO Prevent Recurrence F
g S
039 800503 S
2.7 B
N/A N/A HA VALVEX Unit was reduced to and held at 775 MWe for Main Turbine Governor Valve Testing.
040 800510 S
2.8 B
N/A N/A HA VALVEX Unit was reduced to and held at 770 MWe for Main Turbine Governor Valve Testing.
041 800511 F
0.5 D
N/A 80-031/03L-0. ID INSTRU Unit was ramping down to be taken off line in compliance with the Technical Specification for loss of Data Cabinets A and B Direct Rod Position Indication. At 782 MWe, one channel of the DRPI was restored and ramp-down terminated.
3 4
i 2
Method:
Exhibit G Instructions F: Forced Reason:
S: Scheduled A Equiprnent Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee 3-Automatic Scram.
Event Report (LER) File (NUREG-C-Refueling D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination 5
F Administrative Exhibit I-Same Source G Operational Error (Explain)
(9/77)..
Ilother(Explain)
i D
O R
(.
50-348
}
DOCKET NO.
UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAME
.l. M. Farley - Unit I DATE 6/1/80 W. 6 Ha uston, m NL.ETED BY REPORT MONTH May TELEPHONE (205) 899-5156 Y )U E
Licensee Ee Cause & Corrective Eg
}
}YsM Event y
Action tu No.
Date k
jg g5 5
j gij g Repor: #
mu Prevent Recurrence g
6
'042 800512 S
6.9 B
N/A N/A HH XXXXXX Unit was reduced to and held at 700 MWe to repair a lube oil gasket leak on 1C condensate pump.
043 800519 S
40.8 B
N/A
~N/A HH PUMPXX Unit was reduced to and held at 700 MWe to replace 1A condensate pump and motor due to excessive vibration.
l 044 800521 S
5.0 B
N/A N/A CH PIPEXX Unit was reduced to' and held at 550 MWe to repair a pinhole leak in a socket weld in the low pressure
~
steam.;upply line to 1A SCFP between the low pressure stop valve and seat drain to the condenser.
I b
3 4
I 2
Method:
Exhibit G. instructions F: Forced Reason:
l Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain) 2 Manual Scram.
Entry Sheets for Licensee B-Maintenance of Test 3-Automatic Scram.
Event Report (LER) File (NUREG-C-Refueling 4-Other (Explain) 0161)
D Regulatory Restriction E-Operator Training & License Examination 5
i F-Administrative Exhibit I.Same Source G Operational Error (Explain)
(9/77)
Il-Other (Explain)
~
w
.4 i
~
q e
DOCKETNO. 50-348 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME
.I. M. Farley, Unit 1 DATE 6/I/80 NED BY W. C. Hn I m en 111 REPORT MONTH May
. TELEPHONE (205) 899-5156' "r_
5, c,,,,, c,,,,c,,,,
b No.
Date E
jj k
3.Esd Licensee E,
E2 Action to Event g
Prevent Recurrence g5 j;g g Repor: #
m g
c5 045 800521 S
28.1 B
N/A N/A HH PUMPXX Unit was raised to and held at 700 MWe to complete replacement of IA condensater pump and motor due to bearing failures.
046
- 800531 S
2.7 B
N/A N/A HA VALVEX Unit was reduced to and held at 760 MWe for Main Turbine Governor Valve Testing.
1 l
I 2
3 4
Method:
Exhibit G-Instructions F: Forced Reason:
S: Scheduled A Equipment Fa.sure(Explain) 1 Manual for Preparallon of Dasa B Maintenance or Test 2-Manual Scram.
Entry Sheets for 1.leenses 3-Automatic Scram.
Event Report (1.ER) File (NUREG-C Refueling D-Regulatory Restriction 4-Other (Explain) 0161) i E-Operator Training & Ucense Examination 5
F-Administrative Exhibit 1.Same Source G Operational Error (Explain)
(9/77).
II-Other(Explain) l
--