ML19318A088
| ML19318A088 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/09/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19318A089 | List: |
| References | |
| NUDOCS 8006180440 | |
| Download: ML19318A088 (2) | |
Text
Nanama Power Company
, g 500 North 18th T:reet Pos' Office Boa 2641 I:rmingham, Alabama 35291 Tetephone 205 323-5341
=
s L
f.b%^c7#,7ss, Alabama Pbwer i
June 9, 1980 r 4 so em e seine system Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Recort Attached are two (2) copies of the May,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October '.1, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, hh f QUY F. 11. Clayton, Jr.
FLCJr/JRC:aw Attachments j
cc:
. Ted Cintula (1 copy) 1 rector, IE (10 copies)
Director, R1I (1 copy)
/)
jyOO%
5
//
8 0 0 618 0 Wo !
g
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1980 There were eight (8) power reductions in the month of May.
The following safety-related maintenance was performed in May:
1.
Reworked the outlet, outlet check, inlet and bypass valves for the Gross Failed Fuel Detector.
2.
Reworked the throttle stop lever on 3-2A, 2B and 1B Diesels.
3.
Reworked B air compressor for 1-2A Diesel.
4.
Replaced solenoid valve for mini purge discharge
, valve Q1P13V290.
5.
Repaired DC power supply for Data Cabinet B Direct Rod Position Indication.
r-
-