ML19317G597
| ML19317G597 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/25/1968 |
| From: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19317G598 | List: |
| References | |
| NUDOCS 8003200645 | |
| Download: ML19317G597 (2) | |
Text
,
, g.
f s
+-
.~
r\\
DISTRIBUTION:
W0 h
ih f
s,
- g g Formal Suppl.4 ' _...
DRL Reading SEP 2 51933 DR Reading RPB-3 Reading Orig: FWKaras (2)
R. S. Boyd Docket No. 50-302 T. F. Engelhardt, OGC-L. Lornblith (2)
N. Dube (3)
J. Saltzman D. Skovholt-1*^
4; s
C. G. Long Florida Power-Corporation
?^ -
101 Fif th Street South c -
.g Y D. Nussbaumer, DML St. Petersburg, Flcrida 33701 bec: J. R. Buchanan, ORNL E. E. Hall, RDT Attention:
Mr. J. T. 'Bodgers J. A. Harris, PI Nuclear Project Manager E. B.'Tremmel, IP.
R. Leith, OC Gentlemen:
~
J. Verme, NMH
~
A. A. Wells, AS&LB Provisional Construction Permit No. CPPH-51 is enclosed, together with a copy of a related notice which has been forwarded to the Offies of the Federal Register for filing and publication.
The soustruction permit authorises the Florida Power Corporation to construct a pressurised water nuclear reactor designated as the Crystal River' Unit No. 3 Nuclear eenerating Plant on the Company's site near Crystal River, Citrus.~. County, Florida.
t.
a The sometruction permit has been issued persuant to the Initial Decision of the Atomic Safety and Licensing Board. A copy of the decision has already been sent to you.
Sincerely, grighal $1 ped by Pahr * "'~~ "
Peter A. Merris, Director Division of Reactor Licensing
Enclosures:
As stated above 80032006 M cc:
A. P. Peres, President Roy B. Snapp Florida Power Corporation 1725 K Stre**. N.W.
101 Fifth Street South Washington.
" 006 St. Petersburg, Florida 3370100 nne R RPB-3/ DR..L
....f... 3 /..DRL RPB
........G.C.....
....R.P :DRL DRL O
omer >
f g
.s; i
@.".raQpe,g,,,,,,C,@,o,ng /
,,,I (1 RSBoyd_
PAMorris tf z.
g g,,,,
sunmc >
.../.. f 1/68 9M /68..
9 9/.r4 /.68........9 A.s../ /68
. /..x'..)/. 6 8....
9 part >
ftwn AEC.818 (Rev.9-53)
U.s.sovtiturN7 Pitarm orrKr :ipain:s
_s
,kl
~..~
UNITED STATES.
'. ' an w-D UATOMICsENER'GY COMMISSIOIP y
WASHINGTON, D.C.- 20545%.kf
'A.
~
- . s
- l No.
L-229 FOR IMMEDIATE RELEASE Tel.
973-3335 or 973-3446 g4 3 4J&
( C P1 eRic
\\
L PERMIT ISSUED FOR NUCLEAR POWER PLANT
{
IN CITRUS COUNTY, FLORIDA j
The Atomic Energy Commission's Division of Reactor
)
Licensing has issued a permit to Florida Power Corpora-tion of St. Petersburg for construction of a nuclear power plant in Citrus County, Florida.
Florida Power will build the Crystal River Unit 3 Nuclear Generating Plant at a site on the Gulf of Mexico about 7 1/2 miles northwest of Crystal River and 70 miles north of Tampa.
The facility will use a pressurized water i
reactor and will have an initial capacity of approximately l
825,000 net electrical kilowatts.
Babcock & Wilcox Com-pany will supply the nuclear steam supply system; Gilbert Associates will perform the engineering design and Florida Power Company personnel will supervise construction of the overall plant.
Total cost of construction of the facility,
)
exclusive of fuel, is estimated to be $117,828,000.
Plans call for the plant to be in operation by October 1972 at the latest.
Issuance of the permit follows reviews by the AEC Regulatory Staff and the Commission's Advisory Committee on Reactor Safeguards and a public hearing by an Atomic Safety and Licensing Board.
The board conducted the hearing on July 16-17 at Crystal River and issued a de-cision on September 24 authorizing issuance of the permit.
The permit and the board's decision are subject to review by the Commission and to any order the Commission may make on or before November 8, 1968.
9/25/68 l