ML19317G572
| ML19317G572 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/11/1974 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8003191147 | |
| Download: ML19317G572 (2) | |
Text
-
AEC DIS 7ISUTICN FOR PART 50 DOCKET MATF'* AL-(TDiPORARY FO?li)
CONTROL NO:
1214
~
FILE:
FROM:
DATE OF EOC DATE REC'D LTR MEMO RPT OTER Flerida Power Corporation St. Petersburg, Fla.
J. T. Rodgers 2-11-74 2-14-74 X.,
TO:
ORIG CC OTER SENT AEC PDR XXX A. Giambusso 1 signed 59 CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
50-302
'XXX 60 DESCRIPTION:
ENCLOSURES:
Ltr re meeting 11-28/29-73 trans the following Revision #1 t > rpt Effect of High Energy Piping System Breaks Outside Reactor Building
'.D0 NC :..aayg ACKNOWLEDGED bl S'2'N PLANT NAME: CRYSTAL hiVER $
(60 cys encl rec'd)
FOR ACTICN/INTOD'ATION 2-14-74 GMC BUTLER (L)
]SCIMENCER(L)
ZIDIANN(L)
REGAN(E)
W/ Copies W/4 Copies W/ Copies W/ Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
DiIGilTON(E)
W/ Copies W/ Copies W/ Copics W/ Copies KNIEL(L)
SCl!DIEL(L)
YOUNGBLOOD(E)
W/ Copies W/ Copics W/ Copies W/ Copies
/
INTERNAL DISTEIBUTION 6 REG FILL TECH REVIE'1 DENTON A/T I!'D
,/ AEG FDR HENDRIE GRIMES LIC ASST BRAIDiAN OGC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)
SALTZMA!J MUNTZING/ STAFF MACCARY KASTNER fEARIN (L)
B. IPJRT CASE 101IGHT BALLARD
/CO'JLBOURNE (L)
PLANS GIAMBUSSO PAULICKI SPANGLER LEE (L)
~~
MCDONALD dBOYD S!!AO MAIGRET (L)
DUBE w/ Input jM00RE (L)(B'iR)
STELLO ENVIRO SERVICE (L)
V DEYOUNG(L)(IVR)
HOUSTON MULLER SHEPPARD (E)
INFO SKOVHOLT (L)
NOVAK DICKER SMITH (L)
C. MILES P. COLLINS ROSS KNIGilTON TEETS (L)
B. KING i
jVARCA DENISE PPOLITO YOUNGBLOOD WADE (E)
REG OPR DESCO REGAN WILLIAMS (E)
FILE & REGION (3)
LONG PROJECT LDR WILSON (L)
KLECKER i
MORRIS LAINAS S. REED (L)
CARTER STEELE BENAROYA HARLESS v0 LIBER 11
/
EXTERNAL DISTRIEUTION
(.Jv
- 1 - LOCAL FDR CRYSTAL RIVER. FLA 1 - DTIE(ABERNATHY)
(1)(2)(10) NATIONAL LAB'S 1-PDR-SAN /LA/NY l - NSIC(EUCFJdAN) 1-ASLDP(E/W Bldg,Rm 529) 1-GERALD LELLCUCE 1 - ASLB(YORE /SAYRE/
1-W. PENNINGTON, ih E-201 GT BROOKIRVEN NAT. LAB f
WOODARD/"H" ST.
1-CONSULTANT' S 1-AGMED(Ruth Guss=ap)
/16 - CYS ACRS N LODfk NENMARL/DLUME/AGBABIAN Fli-B-12 7. GT.
Sent to Lic Asst Goulbourne 2-14-74 1-GERALD ULRIF. SON...ORNL l-ED.. MULLER..F-309 GT 8003191/y7 g
s
' Replatory Fite Cy.
3' O \\
Q ' *.f
+000 00*
4
-[
eb M
February 11, 1974 Pw m.o...e...r es y
[f l
.s Mr. A. Giambusso I.U(; !'E 9 y
Deputy Director for Reactor Projects
,[,-q i
Directorate of Licensing lQ EgI 7074 Q
H Office of Regulation L-k U. S. Atomic Energy Commission I,U/,'
.h Washington, D. C.
20545 x
/> "*.t.c.=
.(O
/
In Re: Florida Power Corporation gg Crystal River Nuclear Generating Plant 3_
Docket No. 50-302
Dear Mr. Giambusso:
Enclosed are sixty (60) copies of Revision 2 to the report entitled Effect of High Energy Piping System Breaks Outside Reactor Building,.
for the Crystal River Unit 3 Nuclear Generating Plant. This report was generated for Florida Power Corporation by Gilbert Associates, Incorporated (GAI) and was in response to your letter of December 15, 1972.
A meeting was held on November 28 and 29,1973 with members of your staff during which detailed discussions were held concerning our analyses of high energy fluid line ruptures outside containment, particularly in the case of a main steam line rupture within the intermediate building.
The main area of discussion centered around differences in analytical models used by GAI and the AEC which resulted in discrepancies in the pressure buildup values. It was mutually concluded that 'a reanalysis would be performed and that any necessary changes tc the report Effects of High Energy Piping System Breaks Outside the Reactor Building, would be made via revision.
Revision 2, dated February 11, 1974, contains the changes to this report that resulted from the reanalysis.
Please contact us if you require any clarification of the above information.
Very truly yours, h$2),/-
L
$w j[o
$7A $
J.
. Rodgers g*/ ggJ> l
C Assistant Vice President
, A[A g JTR:ft q
Enclosure Tp
{ g 4,s. ; 4 12fA General Office 32o1 Tniny-founn street sc,utn. P.O. Box 14042, St. Petersburg. Florida 2733 e 813-866-5151
.k;..c:..
Fi'*,;.
pocket 50-302 gebruary 11, 1974 s,W p -j/" ? -
/"J REVISION 2 Effects of High Energy Piping System Breaks Outside the Reactor Building GAI Report #1811 FLORIDA POWER CORPORATION CRYSTAL RIVER III Remove the following sheets:
Insert the following sheers:
Pages: d through 21 Pages:
hrough 21a Pages: J27 23, and 24 Pages: J2 23, and 24 Figures:
1, 4.3.2A, 4.3.2B, 4.3.3 Figures: d l, 4.3.2A, 4.3.2B, 4.3.3 All of the above are consecutive sheets.
Pages:
, and 54 Pages:
53, and 54
- m,f f,
L'..l y
~
qp
/,
c
/f.
(-39.y4.
~
.f % ; LO ~
F
.a,
2'
':n
,c.. y
' A, i.."
i
,f 4sY M-I a
e