Text
-
NJ C g>W 195 U.S. NUCLE An GEGULATORv (
.tiSSION DICKET NUMCER s2 7st g 3 % v)2 NRC DISTRIBUTION roR PART 50 DOCKET MATERI AL TO:
FROM:
DATE OF DOCUMENT Florida Pouer Car,.
12/2/'6
';r." John O toln S t.
20 tersbur;;, Fla.
DATE RECEIVED J. T. Tod cen 12/6/'6
&ETTE R -
ONoroRizEo PROP lNPUT P QRM PauMBER OF COPIES RECEIVED WoRicNAL WUrsLA'ss: PIED Cne signed.
OCO*v OE SCRIPTION ENCLOSURE 1
Ltr. e/ attached....rc our 11/19/76 request
....concerning overpres surization of the reac tor coolant sys tem..
g OWLEDGED NM EEW I
REACTOR VESSEL OVERPRESSURIZATION DISTRIBUTION PER G. EECH 10-21-76 (7-P)
PIANT NAME:
Crystal River Unit' d3 SAFETY FOR ACTION /INFORMATION 12/7/7b
?JL X
BRANCH CHIEF:
(5) stolz k LIC. ASST:
H/l a
_ X PROJECT MANAGER:
Engle INTERNAL DISTRIBUTION D EG FILF V A NRC PDR M I&E (2)
W OWn M'GOSSICK & STAFF V
KNICHT V PAWLICKI 1:OVAK X
ETSENHUT
[BAER SHAO Y
X BUTLER X
ZECH EXTERNAL DISTRIBUTION CONTROL NUMBE R V LPDR: C r'? s ta l i"e r,
'! a.
M TIC:
M NSICr-j
/g N ACRS 16 cyg - ::
_!<ve vn m ( M. A (&h/J4 )
'Y"" W 39t 3180 77s
< A 0
CCFCRM 195(2 76)
.'y po 2 3,. &. %ca?n$,
yJ M')Qg},)Q 3 e e a a
+
WM
- t$
[f 1 becember 2, 1976 5
l sw G
o.5-cg p
i c,
e
@\\
a Mr. John Stol:
- s y#
~
Branch Chief Light Water Reactors Branch I 1[v >
Division of Project Management N,
^s U.S. Nuclear Regulatory Commission s
Washington, D.C. 20555 m
Subject:
Crystal River Unit #3 Docket No. 50-302
Dear Mr. Stolz:
We provide you with the attached interim response to your request of November 19, 1976, "to furnish a description of current administrative procedures or
. design controls that can be implemented now so as to preclude or minimize the potential for overpressuriza-tion of the reactor coolant system."
Our response to your original communication of October 1, 1976, was that we would reply by December 6.
i This, however, has been tempered by attendance at the BSt plant specific meeting in Bethesda on November 5, 1976, conducted by your Mr. Gary G. Zech.
The attached response is in keeping with your ultimate needs as determined from the November 5 meeting (not confirmed as yet to us), and our discussions re: your November 19 request.
It is our request that this submittal be evaluated at the earliest possible time so that our Operating License DPR-72 for Crystal River #3 can be modified to allow operations up to full power.
$?..
$.S.QQ ~
General Office 3201 Thetysounn street soutn. P O Box 14044. St Petersburg. Fionca 33733 813-866 5151
- (. -
- ,; +
=-
, > ~.
'Wm Nr. c John ' St'ol: 1 2~-
December 2, 1976 P1' ease' contact us=should' additional information be.re-
- quired for'the.mo'dification, so that an" orderly procession of events:: from fuel. loading to power ascension -can occur -
without further delay.
'Very.truly yours, J. T. Rodg s.
Asst. Vice President JTR/iw l
~