ML19317G383

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/75-10 on 750806-08.No Noncompliance Noted
ML19317G383
Person / Time
Site: Crystal River 
Issue date: 09/04/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19317G384 List:
References
NUDOCS 8003030791
Download: ML19317G383 (2)


See also: IR 05000302/1975010

Text

UNITED STATES

_

'

.

JCLEAR REGULATORY COMMISSION

REGION ll

\\

230 PEACHTR EE STR EET. N. W. SUITE SIS

ATLANTA. GEO RGI A 30203

31y Ref;r To:

SEP

4 1975

-

-

KW

$/75-10

N

,

.

Plcrids Power Corporation

-

AT'DI:

Mr. J. T. Rodgers .

Assistant Vice President

,

Quality and Environmental Departments

-

3201 34th Street, South

.

P. O. Box 14042

St. Patnrsburg, Florida 33733

-

,

.

Gentlemen:

This r2fers to the inspection conducted by Mr. S. D. Ebneter of this

effica on August 6-8, 1975, of activities authorized by NRC Construction

i

,'

-

'

Parmit No. CPPR-51 for the Crystal River 3 facility, and to the

diccussion of our findings held with Mr. J. Alberdi at the conclusion

ef tha inspection.

Ars

ned during the inspection and our findings are discussed in the

'

ene

inspection report. Within these areas, the inspection consisted of

cel

e examination of procedures and representative records, interviews

with pnrsonnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

,

One new unresolved item resulted from this inspection and is identified

in Srction III of the summary of the enclosed report. This item will

b3 cxamined on subsequent inspections.

In eccordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy.of this letter

and the enclosed inspection report will be placed in the NRC's Public

Dscument Room.

If this report contains any information that you believe

'

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

.

disc 10ture. If no proprietary information is identified, a written

<

ctatraent to that ef feet should be submittet.'.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

, Troq

J

_)

8 00s oso 77/

9

l-

_

_.

__

.-

-.

._

._. .

.

SEP

4 1975

'

-

,

_

.

.

-

.

Florida Power Corporation

-2-

'

Q:

-

6

in the Public Document Room. Your application, or written statement,'

'

-

shculd be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in

'

i

the Public Document Room.

Should you have any questions concerning this letter, we will be glad

,

to discuss them with you.

,

,

Very truly yours,

-

.

-

l

.

SW C'

p , , n g, -

.

Norman C. Moseley

-

.

Director

,

-

,

.

.

Enclosure:

-

,

'

j

IE Inspection Report No.

-

50-302/75-10

-

.

e

$

.

s

e

e

$

n

i

.

-

.

I

e

.

!

.

1

.

1

o

9

. . .

.

.--..-

. - .

.-.-. - -. . ... --