UNITED STATES
o#
ATOMIC ENERGY COMMISSION
\\
!
eh*
DIRECTORAT:: OF 3EGULATORY OPERATIONS.
'
y
mEoeon is - suite aie
s
s
'
) p
230 PE AcMTmst! ST REET, NORT HwEST
,
,4 rgs 0
,
9
4
AT L. A NT A, GEORGa A 30303
,
.
In Raply Refer To:
AM 1 .:E
RO:II:EJV
50-302/73-6
.
,
4
J
Florida Power Corporation
AATN: Mr. J. T. Rodgers
Assistant Vice President -
'
Generation Engineering
3201 34th Street South
P. O. Box 14042
St. Petersburg, Florida
33733
Gentlemen:
!
l
This refers to the inspection conducted by Mr. T. E. Conlon of this
office on July 10-13, 1973, of activities authorized by AEC Construction
i
Permit No. CPPR-51 for the Crystal River Unit 3 facility, and to the
discussion of our findings held by Mr. Conlon with Messrs. Bennett and
Pedrick at the conclusion of the inspection.
.l
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
We have examined actions you have taken with regard to previously
reported unresolved items. These are identified in Section IV of
the sunnary of the enclosed report,
In accordance with Section 2.790 of the AEC's '.' Rules of Practice," Part 2,-
i
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
t
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application. to
this office requesting that such information be withheld from public
disclosure. If no proprietary information is identified, a written
statement to thap effect should be submitted.
If an application is.
submitted, it must fully identify the bases for which information is
l
claimed to be proprietary. The application should be prepared so that
-
!
800303n7 0
4
_
. .
.
.
.
_ _ .,_._._.
_ , . _ ,
_ ,
_
_ _ _ _ . - _ _ _ ___
-
-
w..a--.-.-.--.n-
'
'
s
.m
FloridaPowerCorporation
-2-
AUG1
5 73
,
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement,
.
,s ould be submitted to us within 20 days.
If we are not contacted as
h
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
.
'
d,
it/-
c^
"~ '
p,ng .~.
Norman C. Moseley
Director