Forwards IE Insp Rept 50-302/75-11 on 750826-29.No Noncompliance Noted
ML19317G379
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/16/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgersj T
FLORIDA POWER CORP.
Shared Package
ML19317G380 List:
References
NUDOCS 8003030785
Download: ML19317G379 (2)


See also: IR 05000302/1975011

Text

~

.

,

.

~

m

.

O

UNITED STATES

NUCLEAR REGULATORY COMMISSION

q

)

REGION 11

230 PEACHTREE STREET.E W. SulTE Sts

ss

ATLANTA. GEORGI A 30303

In Reply Refer To:

SEP 161975

..

,

-

IE:II:KWW

_

'

50-302/75-11

.

Florida Power Corporation

ATTN: Mr. J. T. Rodgers

',

Assistant Vice President

Quality and Environmental Departments

-

3201 34th Street, South

P. O. Box 14042

St. Petersburg, Florida 33733

s

Gentlemen:

This refers to the inspection conducted by Mr. K. W. Whitt of this

26-29, 1975, of activities authorized by NRC Construction

office on August

Permit No. CPPR-51 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. J. Alberdi and Mr. J. C. Hobbs, Jr. at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

Within these areas, the inspection consisted of

d

enclosed inspection report.

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

These are identified in Section IV of the summary of the

unresolved items.

enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

If this report contains any information that you believe

Document Room.

to be proprietary, it is necessary that you submit a written application

to this of fice requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

,

submitted, it must fully identify the bases for which information is

claimed to be proprietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

"%

Uq p"r

,3

s003030 7

@

%,,..,s,

_

-

.- .

-

- -

..

_

_.

- _ - - _ _ _

SEP 161975

-

'

-

- .

.

.

-

,_

.

.-

Florida Power Corporation

-2-

,

"

e

.

.

~

.

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in

-

-

the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss titem with you.

.

'

Very truly yours,

.

.

.N

x

Norman C. Moseley

Director

.

Enclosure:

IE Inspection Report No.

50-302/75-11