Text
.
.
-
5
I
.- "N'
UNITED STATES
.m
- " "%q
G
g#
jo
NUCLEAR REGULATORY COMMISSIM
g
f
i
2
hc g
o
REGloN il
Q
$ \\[ f,:, $
230 PE ACHTRE E STR EET, N.W. SUITE 1217
o
'-
E-
ATLANTA, GEORGIA 30303
-
k
b*
,o
In Reply Refer To:
-
RII:RHW
50-302/78-6
-
Florida Power Corporation
Attn:
Mr. W. P. Stewart
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. R. H. Wessman of this
of# ice on March 13-17, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the discussion
of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
j
s
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
l
We have examined actions you have taken with regard to previously identified
'
enforcement matters.
These are discussed in the enclosed inspection
report.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
'
inspections.
-
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2. Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
~'
(J
8002280 fp
.-
.
-__
__
_
_
_ _ _ _ _ _ .
__
_ _ _ .
.
.
.
.
W.is. 3 ; 1978
'N
~
~
Florida Power Corporation
-2-
._
in accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
-
If this report contains any information that you (or your contractor)
Room.
believe to be proprietary, it is necessary that you make a written
,
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
If we do not hear from you in this regard within the specified
document.
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
"I
~
,~
-
.h h
y
F. J. Long, Chief
-
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/78-6
cc w/ encl:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
)
-