Forwards IE Insp Rept 50-302/78-06 on 780313-17 & Notice of Violation
ML19317G346
Person / Time
Site: Crystal River 
Issue date: 03/31/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19317G339 List:
References
NUDOCS 8002280947
Download: ML19317G346 (2)


See also: IR 05000302/1978006

Text

.

.

-

5

I

.- "N'

UNITED STATES

.m

  1. " "%q

G

g#

jo

NUCLEAR REGULATORY COMMISSIM

g

f

i

2

hc g

o

REGloN il

Q

$ \\[ f,:, $

230 PE ACHTRE E STR EET, N.W. SUITE 1217

o

'-

E-

ATLANTA, GEORGIA 30303

-

k

b*

,o

In Reply Refer To:

-

RII:RHW

50-302/78-6

-

Florida Power Corporation

Attn:

Mr. W. P. Stewart

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. R. H. Wessman of this

of# ice on March 13-17, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

j

s

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

l

We have examined actions you have taken with regard to previously identified

'

enforcement matters.

These are discussed in the enclosed inspection

report.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report.

This item will be examined during subsequent

'

inspections.

-

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2. Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

~'

(J

8002280 fp

.-

.

-__

__

_

_

_ _ _ _ _ _ .

__

_ _ _ .

.

.

.

.

W.is. 3 ; 1978

'N

~

~

Florida Power Corporation

-2-

._

in accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

-

If this report contains any information that you (or your contractor)

Room.

believe to be proprietary, it is necessary that you make a written

,

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

If we do not hear from you in this regard within the specified

document.

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

"I

~

,~

-

.h h

y

F. J. Long, Chief

-

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/78-6

cc w/ encl:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629

)

-