ML19317G343

From kanterella
Jump to navigation Jump to search
Forwards LER 78-014/03L-0
Date released: 11/27/2019 Download: ML19317G343


LER 78-014/03L-0:on 780210,chemical Addition Valves CAV 1 & 2 Failed to Close on Completion of Pressurizer Steam Space Sampling.Caused by Incorrect Torque Switch Setting of Valve CAV-1.Operability restored.CAV-2 Corrective Action Pending
ML19317G347
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317G347 (2)
Forwards LER 78-014/03L-0
ML19317G342
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/08/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317G342 (1)