ML19317G252

From kanterella
Jump to navigation Jump to search
Forwards LER 78-007/01T-0
Date released: 11/27/2019 Download: ML19317G252


LER 78-007/01T-0:on 780204,feedwater Isolation Valve FWV-15 Stroke Time Exceeded 34-s During Testing.Caused by Valve Operator w/89-s Closure Time on FWV-15.Operator Renewed
ML19317G263
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/06/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317G263 (2)
Forwards LER 78-007/01T-0
ML19317G251
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/07/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317G251 (1)