o
NUCLEAR REGULATORY COMMISSION
- -
e
g
{
) ce
g
REGloN 18
C',%
'
t
t
230 PEAcHTREE STREET. N.W. SulTE 1217
i
, *
i
e
ATLANTA, GEORGIA 303o3
-
.,
' ' . . . . * *
AFR 2 4 M
In Reply Refer To:
RII:WHB
50-302/78-08
.
Florida Power Corporation
Attn: Mr. W. P. Stewart
!
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. W. H. Bradford of this
~
office on April 3-6, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the discussion
,
l
of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the
i
inspection.
-
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
One new unresolved item resulted from this inspection and is discussed
,
'
in the enclosed report.
This item will be examined during subsequent
inspections.
,
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
i
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the resules achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
8002 280 [M
.
, , . . -.-
. , - -
.
_,---.-.m.
. - - . .
-__,..,m.-
-__-_.--,-.-----------,,---.x_
_ _ - -
.
'
APk 2 41978
.
.
..
.
-,
-
.
Florida Power Corporation
-2-
_
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2. Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
-
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclesure.
Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
..
Sincerely,
.
_ _ _
y~es0
_
l
F. J. Long, ChieT
-
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of' Violation
2.
Inspection Report No. 50-302/78-08
cc w/ enc 1:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
,
'
P. O. Box 1228
Crystal River, Florida 32629