RO-77-78:on 770711,greater than 15% Per Hour Power Change Completed W/O DE-I 131 Analysis.Caused by Procedural Inadequacy.Operating Procedure Changes Initiated to Ensure Prompt Notification
ML19317G227
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/03/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19317G224 List:
References
NUDOCS 8002280860
Download: ML19317G227 (2)


Text

LIUtNbtt tVtW I Mt!"UH I x

CONTROL GLOCX:l l

l l

l l

g,, LEA;E p AINT ALL RtOutRE2 INFORMAT:C.

i 1

6 UCENSEE*

LCENSE EVENT NAME UCENSE NUMBER TYPE TYPE l Fli, l Cl R l P l 3 l l0 l0 l-l0 l 0 l 0 l 0 l 0 l-l 0 l 0 l l 4 l1 l1 l1 l 1l l0 l3 l 7 89 14 15 25 26 30 31 32 T7PE CATEcoRY So CoCXET NUMBER EVENT oATE REPORT cATE O 1 CONT l _ l _ l lLl lLl lo l5 lo l-l0 l3 lo l? l l0 l 7l 1l 1l 7 l 7 l l0 l8 l0 l3 l7 l7 7 8 57 58 SS 60 61 68 69 74 75 E

EVENT DESCRIPTICN gg l In reviewing' previous shift logs, Chem / Rad personnel discovered that a power change 7 89 E-gg { greater'than 15% per hour had been completed without analyzing the DE-I 131 as required 7 89 S

g l by Table 4.4-8 of Tech Spec 4.4.8.

Redundancy NA.

This event was not repetitive.

7 89 E

g l Changes to operating procedures dealing with power changes have been initiated to ensure prompt notification of Chem / Rad personnel upon a power change greater than'15% per hour.

o 7 89 E

paus

'SE" ca"oE "sE E IcdER 7 - 0) couPoNENT coat vouroN o

lClGl @

lZl9l9l9l9l9l W

l Zl Zl Z l l

l Nl 7 89 10 11 12 17 43 44 47 48 CAUSE DESCR:9 TION

/

2 oe l The cause of this event was deternined to be a procedural inadequacy in that the operating 7 89 6.

O9 l procedures dealing with power changes did not refer i:o the Special Condition Surveillance 7 89 8:

] [rocedure SP-442. The Op's will be changed to ensure notification.

ST

% POWER oTHER STATUS o

VERY oGCoVERY oESCRIPTON

[Ej l0l9l0l [

NA l

lAl l

NA 1

70 9

10 12 13 44 45 46-Bi R

o o f ASE AMcVNT oF ACTMTY LoCATEN cF RELEASE

"^

l I

"A LJ L2J l

i 7 8 9

10 11 44 45

~

CC PERSONNEL EXPOSURES NUMBER TYPE CESCRaPTON gg l 0 ] 0 l 0l y[

NA 7 89 11 12 13 6C PERSCNNEL INJURIES NUMBER DESCRIPTON E l0l0l0l l

N'A 7 89 11,12 6C OFFSTTE CONSEQUENCES 1

l NA 7 89 8t LOSS OR DAMAGE TO FAC:UTY Type cESCRPTON L:J l

1 n

7 89 10 LC PUBUCITY Ql NA 7 89 bC 8002280 860 N ADDITIONAL FACT. RS

\\

Jl YB 9

, bE

^

1o l See Attached Supolecentarv Information 3

7 89 HL W. P. Stewart (813) 866-4159 NAME:

PHONE:

8 CPO 4AS.$$7

0 SUPPLEMENTARY INFORMATION

-l v..

1.

Report No.

50-302/77-78 2.

Facility:

Crystal River Unit #3 3.

Report Date:

3 August 1977 4.

Occurrence Date:

11 July 1977 5.

Identification of Occurrence:

Failure to analyze Dose Equivalent Iodine 131 upon a power change greater than 15%

within a one hour period contrary to Table 4.4-8 of Technical Specification 4.4.8.

6.

Conditions Prior to Occurrence:

Mode 1 power operations.

7.

Description of Occurrence:

At 1130 when reviewing turnover from the previous shift, the chief Chem / Rad technician discovered that the DE-I 131 was not analyzed upon a power change of 30%

~

within one hour. The Chem / Rad personnel were not notified of the power escalation as required by the special condition surveillance plan SP-442. The analysis was immediately initiated and analyses were made upon subsequent power changes, substantiating the DE-I 131 remained within acceptable limits.

g Designation of Apparent Cause:

The cause of this occurrence is attributed to procedural inadequacies in that the Chem / Rad personnel were not notified of power escalation.

9.

Analysis of Occurrence:

During power escalations the Iodine spiking phenomena can cause DE-I 131 to exceed the allowable Tech Spec limits.

10.

Corrective Action:

Changes to the operating procedures dealing with power changes have been initiated to insure notification of Cham / Rad personnel upon power level changes greater than 15%/ hour.

11.

Failure Data:

This is the first occurrence of this event.