ML19317G200

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/78-12 on 780508-12.No Noncompliance Noted
ML19317G200
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/06/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19317G201 List:
References
NUDOCS 8002280839
Download: ML19317G200 (2)


See also: IR 05000302/1978012

Text

o

s

kP E8?g(o,,

'

UNITED STATES

,

-

NUCLEAR REGULATORY COMMISSIOft

,

REGION il

[N

{

g

230 PE ACHTREE STREET, N.W. SulTE 1217

\\

., . g

-*

ATLANTA, GEORGI A 30303

o

_

lE B'LE C05

    • "

In Reply Refer To:

JUN 6

1978

RII:NE

50-302/78-12

.

Florida Power Corporation

Attn:

Mr. W. T. Stewart

Director of Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. N. Economos of this

office on May 8-12, 1978, of activities authorized by NRC Operating

- License No. DPR-72 for the Crystal River 3 facility, and to the

discussion of our findings held with Mr. G. P. Beatty at the conclusion

of the inspection.

/

Areas examined during the inspection a nd our findings are discussed in

O

"

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this~ letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

_

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this.

regard within the specified period, the report will be placed in the

Public Document Room.

8 0 02 280 [.7 f

'

-

._

-

t

.

.

Florida Power Corporation.

-2-

M 0 61978

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

-

w

C. E. Murp

. e

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report

No. 50-302/78-12

l

cc w/ encl:

t

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

~ Crystal River, Florida 32629

.

1

,

4

%

r

-. . - .-.

.

--

-

-

.

. _ - - _.

. - . , ,

- - . . . _ . . -

. . . . .