ML19317G149
| ML19317G149 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/08/1977 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19317G150 | List: |
| References | |
| NUDOCS 8002280738 | |
| Download: ML19317G149 (2) | |
See also: IR 05000302/1977018
Text
.
g.' "
,
.
N
p ** "'8&g
UNITED STATES
N
t
i
o
NUCLEAR REGULATORY COMMISSION
g
g
e
g
REGloN il
g
230 PEACHTREE STR EET, N.W. SUITE 1217
-
k
~
ATLANTA. GEORGIA 30303
%...../
gEC06
8 1977
In Reply Refer To:
RII:RHW
50-302/77-18
Florida Power Corporation
Attu: Mr. W. T. Stewart, Direc. tor
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
Gentlemen:
.
This refers to the inspection conducted by Mr. R. H. Wessman of this
office on October 4-7, 1977, of activities authorized by NRC Operating
Lican a No. DPR-72 for the Crystal River 3 facility, and to the dis-
cussion of our findings held with Mr. C. P. Beatty, Jr. at the conclusion
of the inspection.
Areas examined during the inspection and our fitAings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspectioc, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed
inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the rusons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
O
.
0002280 D [
q
.
_ _ _ _ _ .
--
^
.
-
-
8 lE! '
-
s,
.
Florida Power Corporation
-2-
.
i
Should you have any questions concerning this letter, we will be glad
to discuss tl.en with you.
i
Very truly yours,
.
r
~%h{
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
RII Inspection Report No.
50-302/77-18
cc:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida
32629
.