Forwards Insp Rept 50-312/70-01 on 700112-14.Noncompliance Noted
ML19317G050
Person / Time
Site: Rancho Seco
Issue date: 02/13/1970
From: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19317G051 List:
References
NUDOCS 8002210750
Download: ML19317G050 (3)


Text

?

THIS DOCUMENT CONTAINS POOR QUALITY PAGES FEB 131970

3. S. Boyd, Assistaat Director for Besator Projects, Division of peneter Licensing (2) 7 33g333330 mgICIPAL Uf2LIrr Distr 2 (BABCEO SECO) - DOCIET NO. 50-312 The emelooed report of the special initial Saality Assuranse inspectionn of the subject facility is tramanitted for information.

Alw the constreettaa preit for this facilit,y was issued in b

october 1968, the subjeet of esality Assuranse was reopened by sal This actica consed M

as a post-ecastzustica permit raview itca.

Ctasplianse to iaalude the Beasho Seen famility in our special

,{'

Saality Assurance inspectica program.

This inspeetica covered the estivities of the comer and the A/E-d I

The Construction Maanger, Boehtel Corporation, Yerson Division.

[

--i-aostractor, n beoet a vil ca (atu), had been inspeted pre-vionely (co asp ets no. 289/69 6.ad 3ao/6ssa).

amis-foema that the activi*<- inspeted were belas prm 3 j

in noemedance with the progresa described in the submittel to DEL and were semerally sensistent with the intent of the ps: :i Appendiz 3

(

1 to 10 CFR 50. In soise armes, however, writteatWb. were mot la effect to movers the enadmet of work. Corrective asasures are being I

Men by the liosasee. ytertherssore,the contreet between the owner and the meelear supplier, IEN, was signed some time ago and does act M provisions for a Saality Assurance program on the part of M The lieanses stated that contractual negotiations are in pro-j fat to upgrade the Bh5 Snelity Assuranse program.

h-k will follow up on the proumpt development of procedures to (('J i

vera work now in progassa, the schedule for development of pro-i durge aseded in the future, and the status of angotiaticas to t

\\

{ grade the Bhis QA progress.

srprf 8

l T\\

.T. P. O'Reilly, Chief

\\

Beactor Inspection and Enforeement Branch i

Division of M14==ce

/

.closare *

\\

l anvend me. 112/70 1

/

ok U

L q

8 0 02 210 }$C

-?

~

i.

~

M, o

2-R. S. Boyd FEB 1 3 ;979 asv/enelosure:

E. G. Case,IMI

' _ e-

8. Levine, D1% (6)

D. J. Skovholt, DIE (3)

L. Kornblith, Jr., CO R. W. Eirknaa, CO:I J. G. Davis, CO:II E. I. Grier, CO:III D. I. Walker, CO:IY R. W. Smith, CO:V

'~' g G. S. Spencer, CO V BG Central File I

I i

i

/

\\.

0a, omca >

summe >

JBHe IAon:A)..J..He411 $

our>

. 2/12/.7.Q.....2/19/70

.l g" *"c-sman. >m

,,n,,,,,g,,_,_,,,

.