Responds to NRC Re Violations Noted in IE Insp Rept 50-312/77-01.Corrective Actions:Automatic Reactor Trip Test Accomplished on 770113 & Evaluation Will Be Published in Startup Rept.Turbine Trip Test Scheduled for 770311
ML19317G011
Person / Time
Site: Rancho Seco
Issue date: 02/09/1977
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19317G007 List:
References
NUDOCS 8002210710
Download: ML19317G011 (2)


Text

-

)

l 90su SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street. Box 15830. Sacrarnento. California 95813; (916) 452 3211 1

' February 9, 1977 Docket No. 50-312 Director of Regulatory Operations ATTN:

R. H. Engelken t

Region V A

}

NRC Operations Office 1990 N. California Boulevard N.

Y Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 Re: NRC Inspection 77-1 Conducted January 11, 12 and 13, 1977 Doir Sir:

In reply to your inspection conducted by Mr. R. Dodds and Mr. 31.

Malmros on January 11 through 13, 1977, we of fer the following explana-tions and corrective actions which will assure full compliance with NRC

(

N requirements.

(

Appendix A of your letter states:

A.

Contrary to your commitment as part of the Posteriticality Test Program in Section 13.5, Item 8, of the FSAR, the Turbine / Reactor Trip Test at 100% power has not been conducted nor has a schedule been established for conducting this test.

SMUD Reply to Item A:

The Rancho Seco Unit I'Startup Program has encountered several long and serious delays. The turbine repair necessitated a six-month outage between July and December 1975 and the subsequent main generator problems delayed the startup testing an additional eight months. Since mid-October 1976 to the present, Rancho Seco has been operated at or near I

peak power output in order to conserve the water shed that SMUD has stored in their hydroelectric projects. At this time, the hydroelectric storage l

1s less than four days power production for the District's customers.

Needless to say, every shutdown at the Rancho Seco unit greatly depletes j

this backup storage capacity and the District would like to limit unneces-sary shutdowns because of the increasing severity of the drougne conditions and lack of potential runaff to refill the reservoirs. An automatic reactor trip test was accomplished on January 13, 1977, a few hours after the reactor inspectors left the plant site. The data is being evaluated and prepared for publication in the. forthcoming Startup Report.

8 0 02 210 NO

~

R. H.~Engelken February 9, 1977' i

l Pending a positive response from NRC Licensing to conduct the three I

year tendon surveillance test during the October-November 1977 refueling outage, the turbine trip t.est has been scheduled for March 11, 1977. On j

this date the turbine will be manually tripped and all the transients followed to assure they stay within the required limits. This final test will complete.all the testing required to' complete the Rancho Seco Startup Program.

Thesa corrective actions will bring Rancho Seco in full compliance with your audic finding.

Respectfully submitted.