Text
,
.o rre,b, u
UNITED STATES y
j' 7 NUCLEAR REGULATORY COMMISSION
{ g h,,
l WASHING TON, 0. C. 20SSS
%>d o
- [
'{
llA3 2 21073
- ...=
Docket No. 50-346 Toledo Edison Company NfIti:
Mr. Lowell E. Roe Vice President, facilities Development Edison Plaza 300 Nadison Avenue Toledo, Ohio 43652 Gentlemen:
SUBJECT:
ISSUANCC OF AMENDil.NT NO. 9 'IO FACILITY OPSATING LICOTSE iO. aPF-3 EOR DAVIS-3 ESSE NUCLEAR POWER STATION, UNIT NO. 1 The Guclear Pegulatory Cornaission has issued the enclosed Amendment No. 9 to Facility Operating License No. NPF-3. Amendment No. 9 consists of changes to the Technical Specifications in response to your request datad December 12, 1977.
This amendment revis's the Technical Spcifications to Facility Operating License Go. NPF-3 to incorporate limiting conditions for omration and surveillance requirements for existing fire protection systems and ad1tinistrative controls. The enclosed Technical Speci-fications have been somewhat modified from those proposed in your December 12, 1977 submittal. These interim Technical Specifications, as modified and agreed to by your staff, shall become effective 30 days af ter the date of issuance of Amendment No. 9.
Tne 30 day period of time is provided in order that you may modify procedures to conform with the details of the enclosed interim Technical Soecifications and to complete any required personnel training where necessary.
One requirement that was not agreed to by your staff relates to the i
minimum size of the fire crigade.
In your sutmittal of Decemcer 12, 1977, you recommended a minimum size for the fire 'origade as two persons.
Subsequent to your Cecetter 12, 1977 sudaittal, you ccdified the minimum size of the fire brigade to three persons. As discussed in our Safety Evaluation, we have concluded that the minimum size of the fire brigace should be five persons.
In order to achieve expeditious i::ulementation of the fire protection pecgram, the Technical Specifications being issued at this time scecify a minimum number of three for the ensite fire brigade menters as you prooosed. Hcwever, you are requested to let us know within 20_ Jays whether a requiretrent of a minimum fire brigade size of five is ob;ectionaole.
If you ooject,_you should specify your reasons and the MS
m 1:r,
.r%
s
'icledo Edison Cogany N 2 21978 technical casea therefor. If you have no objection to this soecific recuirement, it is ncnetnoless impcrtant to let us know within 20 cays. If we do not near from you on this subject, we will act to issue tne change on the casis that assumes your agreement.
Copies of tne Federal Register Notice of Issuance of Mendmnt tio. 9 crd tne Safety Evaluation Supoorting Mendment No. 9 to Facility Operating License No. IGF-3 are also enclosed.
Sincerely, Original signed bp John F. Stciz John F. StolY, Chief Lignt !?ator Reacters Branca cM.1 Division of Project Managa.ent 2nclosures:
1.
A: rara.txmt No. 9 to License 24.
tGF-3 2.
Federal Fegister Uctico 3.
Safety Evaluation Supporting Acendment No. 9 to License No. tiPF-3 cc w/ enclosures: See page 3 gG' b< V WWf 4
g S& &'Y qf' SEE PREVIOUS YELLOW FOR CONCURRENCES LWR 1*
LWR 1, O STS/00R*
OELD LWR 1 i
BScott/ red
..LEng
_~9 JWetmore GFess JSto6rt
_313/18__
3/@ R 8 3Z3/7R _
3/ /78 3/Y7/78~
NRC FORM 31s (9 76) NRG 0240
- u. s. eovaasounwr esuarine orricas este-ees.eae
1
'ibledo Ediacn Ces any _ have no objection to this specific requitecent, it is ncnetheless imortant to let us know within 20 days.
If we do not hear from you
( on tnis subject, we will act to issue the chargJe on the casis that g
assur.es your agreement.
Cc\\
pics of the Federal Rogister riotice of Iscuance of A.cndoent Ho. 9 and h2e Safety Evaluation Suoporting Amendrent tio. 9 to Facility Cpersding Lice:tse No. NPF-3 are also enclosed.
Sincarely, Jonn F. Stolz, Chief Light Water Reactors Branch No.1 Division of Project.'ianage.wnt
Enclosures:
x 1.
,Wrcent No. 9 to Licence :Jo.
tGF-3 2,
F(detal Recister Notice 3.
3afety Evaluation Supporting \\
A;::ccment No. 9 to License N
Go. nPF-3 x
x cc w/ enclosures: See page 3
\\x N
N
\\
\\
V V, spe i
1 t
-. \\
n k<,4 TV. Wo LWR 1,
l BScott M LEng 7 [
JWetmore)
GFess JStolz su,,,, s.
._/3/78 3/3 /78 '
3/$/78~
3/ /78 3/ /78 3
o,.
NRC FORM Me (P.%) NRCM 0240
- u. s. eavammmewv re wrime o,-ices sete ese4u
p m
+
,A w
, 3.
213 license armnd cnt oecozes effective 30 days after the dato of issuance.
EUR T!iE :.'UCIZE RMJIldCIE COMP.I55ICri
,\\
John F. Stolz, Cnief Lignt Water Reactors 3 ranch No. 1 Division of Project Managemnt Attac:. rent:
g Changes to tne Techni Specificatiens cate of Issuance:
' / WY E^
o V
8 s/3/>f g
7 v. v/~ 6* d f pj[d~
g NM MM
\\
ST M OEL[b#
LWRQh
_LWatmhe GFess JStolz
.,,,e.
BScottb LEnok
.... 3/3/]8_.
_ JZ 3 LZ8.__
_343118
_3/$/Z8_..
_3/_ lZS_ _
om,
wac roax. 3:e +m.wcu ase
- u
.. - in
..m. orric im -
~
2 2 7978 Toledo Edison Company ;
4 cc:
Mr. Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Clevela;'d, Ohio 44101 Gerald Charnoff, Esq.
Shaw, Pittman, Potts and Trowbridge
~
1800 M Street, N. W.
Washington, D. C.
20036 Leslie Henry, Esq.
Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, Ohio 43604 Mr. Harry R. Johnson Ottawa County Courthouse Port Clinton, Ohio 43452 Ohio Department of Health AM: Director of Health 450 East Town Street
' Columbuc, Ohio 43216 Ator.ic Energy Control Board P. O. Box 1046 Ottawa Ontarlo, Canada Harold Kahn, Staff Scientist Power Siting Commission 361 East Broad Street Coluntus, Ohio 43215 i
Mr. Bruce Blanchard Environmental Projects Review Department of the Interior Room 5321
- 18th and C Streets, N. W.
Washington, D. C.
20240 1
i s
4 a
n
~._, - - -
q,,. my q :<-
~
21edo Edison c apany ~ MAR 2 21973 cc: Mr. Donald II. Gauser, Esq.
nm Cleveland Electric Illu:::inating C@y P. O. Box 5000 Cleveland, Ohio 44101 Gecald Charnoff, Esq.
Shaw, Pittawa, Potts arrl Trowbridge 1600 M Street, N. h.
Washington, D. C.
20036 Leslie Henry, Esq.
Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, Onio 43604 Mr. Harry R. Johncon Cttawa Ccunty Courthouse Port Clinton, Ohio 43452 Chio Decart=ent of Scalth ATHl Director of Healta 450 East Town Street Colu::6.:c, Ohio 43216 Atccic Energy Centrol Board P. O. Box 1046 Cttawa Ontario, Canada Harold Kann, Staff Scientist Po er Siting Comission 361 East Broad Street Colu::::us, Ohio 43216 Mr. Bruce alanchard Environmental Projects Review Department of the Interior Focza 5321 lath and C Streets, N. W.
Washington, D. C.
20240 oarics >
ev.maus >
oats >
NRO FORM 318JM6) NRCM 0240
- us e.ymnuent Penwrime otrM:e teve-ese.ees l
-