ML19317F689
| ML19317F689 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/22/1978 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19317F680 | List: |
| References | |
| NUDOCS 8001230587 | |
| Download: ML19317F689 (5) | |
Text
.
em.
IRIITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-346 THE 70LEDO EDISON COMPAW AND THE CLEVELAND ELECTRIC ILLLHINATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT to. 1
- tK7FICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. '9 to the Facility Operating License No. NPF-3, issued to the Toledo Edison Company and the Cleveland Electric Illuminating Ccmpany, for operation of the Davis-Besse Nuclear Power Station, Unit No.1 (the -
facility) located i1 Ottawa County, Ohio. Amendment No. 9 becomes effective 30 days af ter the date of issuance.
The amendment incorporates fire protection Technical Specifications on the existing fire protection eqaipment and adds administrative controls related to fire protection at the facility. This action is being.taken pending completion of the Comission's overall fire protection review of the facility.
1 The amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulaticos. The Comission has made appropriate findings as required by the Act and the Comi.ssion's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment. Prior public notice of this amen 1 ment was not required since the amendment does not involve a significant ha::ards consideration.
4 8001230 j
3
- The Comission has determined that the issuance of this amendment will not result in any significant environmental inpact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action see:
(1) The Toledo Edison Company's application for amendment dated December 12, 1977, (2) Amendment No. 9 to License No. NPF-3, and (3) the Comission's related Safety Evaluation supporting Amendment No. 9 to License No. NPF-3. These items are available for public inspection at the Comission's Public Document Room, 1717 H Street, M. W. Washington, D. C.
20555 and at the Ida Rupp Public Library, 310 Madison Street, Port Clinton, Ohio 43452. A copy of items (1) and (2) may be obtained upon request addressed to the U. S.
Nuclear Regulatory Commission,. Washington, D. C.
20555, Attention: Director, Division of Project Management.
Dated at Bethesda, Maryland, this 12' ay o f '7AW A-1978.
FOR THE NUCLEAR REGULATORY COMAISSION 3
.. s
\\
M l
)
r-s f i..l..:,%UN
~
oo D
0
' John F. Stol::, Chief OoJ
' Light Water peactors Branch No.1 O'
_3_
Division of Project Management D
_ S _1 f
a a
.eg ig N,r -
Y
's.
E 1
A.
. The Comission has determined that the issuance of this aardwnt will not result in any cignificant envircncental impact and that pursuant to 10 CFR 551.5(d)(4) an envircomntal ircact state:ent or negative declaration and environmental innact aopraisal need not be prepared in connection with issuance of this amndmnt.
For further cetails wita res:cct to this actica cae:
(1) 'b.e Toledo Odi'cn Comcany's a: plication for amenc'acnt dated Occerber 12, 1377, (2) Anendment No. 9 to Licence No. NPF-3, sna ( 3) the cercissicr.'s relate:
Safety Evaluation suppcrting A:urrzent :;o. ts to Licence.:c. NJF-3. Tnese iterc are availacic for puclic incpection at the Cc=ission's Penlic Ccc'scr.t Roca,1717 ' Street, N. W. dasningten, 0. C.
20555 cm.d at tne Ida supp d
Public Library, 310 "acison 3treet, Port Clinton, Ohio 43432. A cocy of itcina (1) and (2) may ba octained tnon rcquest addresced to the C. 3.
Nucicar Regulatory Ccerticalcn,,iaanington, D. C.
20355, Attention: Cir:ctor, civision cf Project Manayant.
Cated at Setnecda, Maryland, this.*.2 day Of M k-1970.
?J2 'NE SOCLFAR i:E~.A!03Y CCMISSI54 PO
#" I S'3"*d hZ '
D D
John F. Stolz
- U Jonn F. 3to11, Chief D
}k d
Division of Project danagement Light Water Rcacters Branch :;o.1 v,
s JL a
i hi U2. q\\
d SEE PREVIOUS YELLON FOR CONCURRENCES
- p,
F
.QkD
_ LNR -1 LWR 1*
LWR @ M DOR
- o,,,..,
BScott/ red LEnaTe/
TWambach GFAu
.1RtnlD
.v e.. *
._3 '3/ 78 3/f$/78 3/3/7R
_34b42fL._
.._34bl8._.__
s.,.
NRC FORM 318 (N6) NHOi 0244 8 ve s.oovennessme ranseries opricas note ase.sa4
- -3 w
u b
5.*
6 e,
. The Comission has determined that the issuance of this a.encrent will not result in any significant envirorrental i cact and that purcuant to 10 CER $51(d)(4) an environrental statenent or negative declaration
\\
and envirovental i=act aporaisal need not be prepared in connection N
with issuance of tnis anentent.
For further [etails with rescoct to tais action, see:
(1) Ncenacent
\\
No. 9 to License :40% NPF-3, and (2) the Comission's related Safety Evaluation supoorting Amndment No. 9 to Licenne Uc. UP?-3.
Thece itors
\\ nspection at tne Cce.niscion's Public Occ=cnt r.re availacle for pcblic icoa,1717 H Street, N..i.. '9ington, D. C.
20555 and at tne Ida P.upp
\\
I-ublic Lihrary, 310 "iadison 5thet, Port Clinton, Onic 43452. A cocy N
of itens (1) and (2) may a obtained ucen request addressed to the U. S.
N Nuclear Regulatory Comission, Hannington, D. C.
20555, Attenticn: Dirs ter, Civicien of Project Managemtnt.
Oated at Betnesda, Maryland, this day of 1978.
ECR THE.. ' CLEAR RECCIATOR*f CC :MISSICaJ oO D
D Jonn F. Stcl, Chief wo1 Light '.iator Reagtors 3 ranch No.1 Division of Projk:t Management D
f
~.1 w.
UVW
'5/1/7f r.v. s bsd A
.,,,c.,
c BScott P LEMe GFess JStolz afSns afs n a."
3f f78 3,
f78 NRC FORM 318 (9.?6) NRCM 0240 s' u. o. oov,anosusc e in, e oprics...,e - eae.eae.
It'AR 2 2 473
. s n.
s:
DISTRIBUTION.FOR AMEN 0 MENT N0. 9 TO DAVIS-BESSE OPERATING LICENSE NO..NPF-3 Docket File T. Wambach NRC PDR L. Brenner Local POR.
LWR 1 File Attorney, ELD i
R. S. Boyd R. C. DeYoung t
I
]
D. B. Vassallo J. Stolz 4
j L. Engle E. Hylton F. J. Williams H. Smith B. Scott w/o tech specs
}
IE (5) l
.fl. Dube, MIPC w/o tech specs M. Jinks, 0A w/4 encls 1
- 11. Miller, ADM w/o tech specs V. A. Moore H. Denton R. H. Vollmer j
fl. L. Ernst i~
W. P. Gammill
'R. J. Mattson w/o tech specs J. P. Knight D. F. Ross R. L. Tedesco
^
B. Scharf, ADM (15 cys)
D. Skopolt
'i
'A.-Toalston, AiG w/o tech specs E. Hughes j
EP Project Manager EP Licensing Assistant V. Stello K. Goller J. McGough D. Eisenhut R. Reid DT@]D G. Vessig E 3 JU bcc:
J. R. Buchanan, NSIC p'
T.- B. Abernathy, TIC D-
~ T P
~ '{
- '{
d A. Rosenthal, ASLAB g
2;3 i
3 m*
r r S
,--,y m,___,
-_y7
-y-v-
-y-
.y y,
-