Text
-_
!.
. . , _ . _ _ _ . _ _ _ . -
--
_
._ ---
-
u- .
-- ---
)
_._
y
n,
.'
_C
,
5
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGloN lil
j
799 ROOSEVELT ROAD
GLEN ELLYN ILLINOIS 60137
.
..-
AUG 2 0 1975
e
.
.
Toledo Edison Company
Docket No. 50-346
ATIN: Mr. Lowell~E. Eoe
..
Vice President
g Pg
Faef11 ties Development
y
n
Edison Plaza
V
J'
300 Madison Avenue
.
O
'D ~9'T
Toledo, Ohio
43652
.
.
. .h
3
.
4
.
-.-
'
Gentlemen:
. . .
This refers to the inspection conducted by Messrs. Naidu, LeDoux, and
Erb of this office on July 29-31, 1975 of activities at Davis-Besse
Nuclear Power Station Unit 1 authorized by NRC Construction Permit No.
C7PR-80 and to the discussion of our findings with you and Messrs. Iiovah
and Lenardson of your staff at the conclusion of the inspection.
'
!
A copy of our report of this inspection is encioned and identifies the
areas e:macd during the inspection. Within these areas, the inspection
consisted of a. selective ex=ination of pro:edures and representative
records, interviews with plant personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities
appear to be in noncompliance with NRC requirements. The item and
j
reference to the pertinant requirmants are listed under Enforcement
Action in the Sumr ary of Findings Section of the enclosed inspection
i
report.
This notice is sent to you pursuant to the provicions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Cihla 10, Code of Federa .
Regulations.
Section 2.201 requires you to submit to this office within
'
tvinty days of your receipt of -his notico, a uritten s:atencat or
explanntion in reply, including-
(1) corractive stcpc which have boca
taken by you, and the results achieved; (2) corrective steps trhich vill
'
be taken to avoid further items of noncor.:alianec; and (3) the data tinen
full compliance will be achieved.
l
,
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
!
2, Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice '#11 be
'
placed in the 5.C's Tublic Doccznent Roon.
If this report contains any
infor=c. tion t'r.t you or yonr contractors believe to be preprietary, it
o
ecsoary that you cake a written application to this office, within
+f
.s
-)a Ay
D( / ,
"'* '#
sooi 2so ?M
!
y
,
_ _
-
, -
--
-- - --
- - - - -
5
-
%
AUG 2 0 1975
2-
Toledo Edison Company
-
.
.
twenty days of your receipt of this notice, to withhold such information
from public disclosure. Any such application must include a full statenwint
of the reasons for which it is e1=4-d that the information is proprietary,
and should be prepared so the proprietary information identified in the
application is contained in a separate part of the document. Unless we
receive an application to withhold information or are otherwise contacted
within the specified time period, the written material identified in
this paragraph will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
'
Sincerely yours,
..
,
.
1
D. M. Hunnicutt,, Chief
.
. .
Construction and Engineering
Support Branch
0b
'
.
i
Enclosure:
.
. .
IE Inpection Report
. . . .
. .
..
No. 050-346/75-15
.-
. .. .