ML19317F610

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/75-15 on 750729-31. Noncompliance Noted
ML19317F610
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/20/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19317F596 List:
References
NUDOCS 8001150928
Download: ML19317F610 (2)


See also: IR 05000346/1975015

Text

-_

!.

. . , _ . _ _ _ . _ _ _ . -

--

_

._ ---

-

u- .

-- ---

)

_._

y

n,

.'

_C

,

5

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGloN lil

j

799 ROOSEVELT ROAD

GLEN ELLYN ILLINOIS 60137

.

..-

AUG 2 0 1975

e

.

.

Toledo Edison Company

Docket No. 50-346

ATIN: Mr. Lowell~E. Eoe

..

Vice President

g Pg

Faef11 ties Development

y

n

Edison Plaza

V

J'

300 Madison Avenue

.

O

'D ~9'T

Toledo, Ohio

43652

.

.

. .h

3

.

4

.

-.-

'

Gentlemen:

. . .

This refers to the inspection conducted by Messrs. Naidu, LeDoux, and

Erb of this office on July 29-31, 1975 of activities at Davis-Besse

Nuclear Power Station Unit 1 authorized by NRC Construction Permit No.

C7PR-80 and to the discussion of our findings with you and Messrs. Iiovah

and Lenardson of your staff at the conclusion of the inspection.

'

!

A copy of our report of this inspection is encioned and identifies the

areas e:macd during the inspection. Within these areas, the inspection

consisted of a. selective ex=ination of pro:edures and representative

records, interviews with plant personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities

appear to be in noncompliance with NRC requirements. The item and

j

reference to the pertinant requirmants are listed under Enforcement

Action in the Sumr ary of Findings Section of the enclosed inspection

i

report.

This notice is sent to you pursuant to the provicions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Cihla 10, Code of Federa .

Regulations.

Section 2.201 requires you to submit to this office within

'

tvinty days of your receipt of -his notico, a uritten s:atencat or

explanntion in reply, including-

(1) corractive stcpc which have boca

taken by you, and the results achieved; (2) corrective steps trhich vill

'

be taken to avoid further items of noncor.:alianec; and (3) the data tinen

full compliance will be achieved.

l

,

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

!

2, Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice '#11 be

'

placed in the 5.C's Tublic Doccznent Roon.

If this report contains any

infor=c. tion t'r.t you or yonr contractors believe to be preprietary, it

o

ecsoary that you cake a written application to this office, within

+f

.s

-)a Ay

D( / ,

"'* '#

sooi 2so ?M

!

y

,

_ _

-

, -

--

-- - --

- - - - -

5

-

%

AUG 2 0 1975

2-

Toledo Edison Company

-

.

.

twenty days of your receipt of this notice, to withhold such information

from public disclosure. Any such application must include a full statenwint

of the reasons for which it is e1=4-d that the information is proprietary,

and should be prepared so the proprietary information identified in the

application is contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in

this paragraph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

'

Sincerely yours,

..

,

.

1

D. M. Hunnicutt,, Chief

.

. .

Construction and Engineering

Support Branch

0b

'

.

i

Enclosure:

.

. .

IE Inpection Report

. . . .

. .

..

No. 050-346/75-15

.-

. .. .

1H

!

=

p1.,,g

.b

3

'

v

bec w/ enc 1:

'

'

PDR

.,

Local PDR

1

NC:C

TIC

,,

U. Young, Nuclear Engineer

t

,

.,

j

'

.,

i

!

.

.

.

T

,-

-