RO 270/77-03:on 770215,reactor Bldg Pressure Transmitter Channel 2 2BS4-PT2 Found Out of Calibr.Cause Unknown. Transmitter Recalibr.No Evidence of Setpoint Drift
ML19317F402
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/17/1977
From:
DUKE POWER CO.
To:
Shared Package
ML19317F399 List:
References
RO-270-77-03, RO-270-77-3, NUDOCS 8001140651
Download: ML19317F402 (1)


Text

n

- 1

i

', >

  • MhD

- DUKE POWER CO'fPANY I

' ~ "

r

llll LOCO 2EE UNPt'2-r 7

Report'No'.:.RO-270/77-3 i

Report Date_: cMarch 17, 1977 Occurrence Date: ' February.15,-1977 L 0conee Unit 2, Seneca, South Carolina Facility:_

Reactor Building pressure transmitter

~ Identification of Occurrence:

out of calibration

-Unit 3! 100 percent full power

' Conditions Prior to Occurrence:

Description of Occurrence:

while-performing a comparison of readings on the 15, 1977, On February ~

three Reactor Building narrow range pressure transmitters, a difference-

~

Investigation revealed that Reactor Building of 0.6' psi was noted.

narrow range pressure transmitter Channel 2 2BS4-PT2, was set less conservative than the'setpoint specified in Oconee Technical Specifica-The pressure transmitter was promptly'recalibrated to the tion 2.3.

required specifications.

Apparent Cause of Occurrence:

Examinations of E The cause of this inci kat has not been determined.

the Reactor Building pressure transmitters ~were made periodically over a one week' span of time to determine if the transmitters were experienc-

.ing drift'but no-indications-of-setpoint drift were found.

Analysis of Occurrence:

'The. Reactor Building pressure is sensed by three redundant pressure trunsmitters which provide inputs to the Engineered' Safeguards (ES)

~

~

h l ~being set

, system...This incident resulted in;one of the three c anne s i d

--slightly. less conservative et 5.6 psi rather than at 4 psi as requ re The two redundant channels of by Oconee Technica1' Specification 2.3.

the Reactor Building pressure transmitters assure tnat the ' required

~

It is therefore

{ inputs-to the ES system.would have been' supplied.

considered:that;the health'and safety of the public were not affected JbyJthis occurrence.

Corrective-Action:

~

The Channeli2 Reactor Building pressure transmitter was recalibrated to A check of all three pressure transmitters ithe'requirad specifications.

wasi made'and the~ Reactor Protective System'setpoints were verified to ube within~ Technical Specifi:ation limits.

~

. Examinations of f the :three jeacter Building pressure transmitters were iperiodicallyLmade over' a one week time span to ' determine.if the :trans-mitters werejexperiencing any drift..'No; evidence of setpoint. drift was a

" discovered. L ' No1 further -corrective " action is considered necessary.

1 jw.

3001140. N p '

=,

gz

. ~

m

.