RO 270/77-02:on 770213,reactor Bldg Spray Valve 2 BS-2 Found Inoperable.Caused by Valve 2BS-2 Closing Too Hard on Valve Seat.Valve Manually Cycled to Unseat Valve & Torque Switch & Closing Limit Switch Reset
ML19317F393
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/11/1977
From:
DUKE POWER CO.
To:
Shared Package
ML19317F390 List:
References
RO-270-77-02, RO-270-77-2, NUDOCS 8001140643
Download: ML19317F393 (1)


Text

y

, p p

4 I

^

.f 1

%Aj

' DUKE POWER COMPANY 1r OCONEE UNIT 2' Report No.: lR01270/77-2 R'eport Dlste:. February.11,'1977 '

January.13, 1977 Occurrence Date: ;

Facilltyi : deonee' Unit: 2,7 Seneca', South Carolina

~

'Inoperabl'e Reactor Building spray valve Identifica' tion of Occurrence:-

-Conditions Prior tofoccurrence:. Unit-at 100 percent full power

~

Descrirtion of Occurrence:

1977, while performing a periodic Reactor Building isolation On. January 13,1 Reactor' Building spray valve, 2BS-2, was discovered valve.' functional test,As' required by Oconee Technical Specification 3.3.7, the y

inoperable.

The torque and operability-of?the redundant valve, 2BS-1, was verified.

closing limit switches of valve 2BS-2 were adjusted and the valve was tested and returned to. service'within six hours.

4 Ayparent Cause of occurrencel d on the valve seat

.This incident resulted from valve,-2BS-2, closing too har

- which -cau'se'd the valve to. stick when. it was cycled.

Analysis of Occurrence:_

Oconee Technical. Specification 3.3.5 allows-the removal of one' train of the This-

-Reactor Building spray system for a period notito# exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

incident resulted in the loss of one train}of the' Reactor Building spray system

ble,

.for six hours. h redundant train, which had been verified opera i

in the event Jretained-full capacity.-to perform its' intended nafety funct onIt.is cons

oflan ES' actuation.

~

!during-which.the Reactor Building spray. valve, 2BS-2, was ino'perable and the

~

operability of the redundant componen:c that the health and safety of the

~

,public were n6t affected by this-occurrence.:

~

Corrective Action:-

^

H

? Valve 2BS 2 was: manually; cycled,.to unscat the. valve and the torque switch- _

i The valve'was verified op'erabic

.and the: closing;11mit switch were reset; Oconee Unit 1)

-:and returned to service. ; The(Reactor Building--spray valves' on l b

'30,.

m fand 3lhad(been tested during routine. quarterly (maintenance on Decem erit-is co

_f

.:1976iand had beeniverified! operable. -

,1 lcorrectivejaction'is... ecessary.3 n