y
, p p
4 I
^
.f 1
%Aj
' DUKE POWER COMPANY 1r OCONEE UNIT 2' Report No.: lR01270/77-2 R'eport Dlste:. February.11,'1977 '
January.13, 1977 Occurrence Date: ;
Facilltyi : deonee' Unit: 2,7 Seneca', South Carolina
~
'Inoperabl'e Reactor Building spray valve Identifica' tion of Occurrence:-
-Conditions Prior tofoccurrence:. Unit-at 100 percent full power
~
- Descrirtion of Occurrence:
1977, while performing a periodic Reactor Building isolation On. January 13,1 Reactor' Building spray valve, 2BS-2, was discovered valve.' functional test,As' required by Oconee Technical Specification 3.3.7, the y
The torque and operability-of?the redundant valve, 2BS-1, was verified.
closing limit switches of valve 2BS-2 were adjusted and the valve was tested and returned to. service'within six hours.
4 Ayparent Cause of occurrencel d on the valve seat
.This incident resulted from valve,-2BS-2, closing too har
- which -cau'se'd the valve to. stick when. it was cycled.
Analysis of Occurrence:_
Oconee Technical. Specification 3.3.5 allows-the removal of one' train of the This-
-Reactor Building spray system for a period notito# exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
incident resulted in the loss of one train}of the' Reactor Building spray system
- ble,
.for six hours. h redundant train, which had been verified opera i
in the event Jretained-full capacity.-to perform its' intended nafety funct onIt.is cons
- oflan ES' actuation.
~
!during-which.the Reactor Building spray. valve, 2BS-2, was ino'perable and the
~
operability of the redundant componen:c that the health and safety of the
~
,public were n6t affected by this-occurrence.:
~
Corrective Action:-
^
H
? Valve 2BS 2 was: manually; cycled,.to unscat the. valve and the torque switch- _
i The valve'was verified op'erabic
.and the: closing;11mit switch were reset; Oconee Unit 1)
-:and returned to service. ; The(Reactor Building--spray valves' on l b
'30,.
m fand 3lhad(been tested during routine. quarterly (maintenance on Decem erit-is co
_f
.:1976iand had beeniverified! operable. -
,1 lcorrectivejaction'is... ecessary.3 n
g l
~
s,.
t.
s.
4~~
c
+
w
{-
Y l
.