'OCONEE UNIT 2-i:
.c _. Report No.': '_RO-270/ 7 7-4 -~
' Report Date:{A'pril.7, 1977-
~
~ 0ccurrence Date: ' March 24,.'1977 Facility: Oconee Unite 2, Seneca, South' Carolina-u Identification ~of> Occurrence: Rod overlap-in excess of Technical Specification
-limit due to a dropped control. rod group; i'
Conditions Prior'to Occurrence: ~Uniti at 78 percent full power
~
. Description'of Occurrence:
~
p a On March 24,z1977, group 6 control rods dropped into the core from a 67%
. withdrawn position reducing the reactor. power level to'44 percent" full power.
A condition'of 5% control _ rod: overlap between rod group 5 and 6 resulted.
Oconee Technical Specification 3.5.2.5 specifies an overlap of 25 1 5%
between.two adjacent operating control rod groups.
The Integrated Control. System-Immediately-relatched the group 6 rods and
. began withdrawing =the rods in order;to maintain the power level a.t 78%.
r.
-Rod 3 in group 6.did not relatch and this asymmetric. rod' caused power to.
be limited'to 55.. percent;-full-power. The power supply.for rod 3 was de--
energized by removing the fuses. No problems were found so the fuses were reinstalled and~ rod 3 was relatched and realigned with'the. rest of group.6.
L Control rod. group 6 ;was'then placed on auxiliary power and reactor power escalation commenced. : Repairs to control rod group 6 power supply'were completed.within four hours and the-group was returned to its normal power I
- supply.
~
[
Apparent Cause-of Occurrence:
~
h This occurrence resulted from the failure of the gate drive of phase "CC"~
ll ~
ine the '?B'? power supply..Normally, the "A" power supply would have held.
[:.
.the rods.in position', however,.the "A".. power supply to the "CC" p'ase
' h
[_
f uiomentarily - failed.. Investigation of the."A": power supply revealed no pro-1 blems. It isipostulated that l prolonged energization of Lone magnetic: phase
-in"the,"A"; power / supply resulted'in tso opposing phases being simultaneously n
nenergized, therefore canceling each other and result'ing in the drop and
.'immediate-relatch of the rods.
e 1
mi
' Analysis of-Occurrence:
ru
_ pv
['<
- ThisLincidentirssulted!inl control rodjgroup;6~ dropping Into the core and.a
[>
fcondition of:;approximately Supercentjcontrol rod overlap existing until group.
C6 control fods'.wereire -positioned.and the required overlap was re-established.
K'
.Thisfreductionin control" rod' overlap'did not' affect the: safe operation of I
lthe reactor andinojcore protectionflimit'sEwere approached.
It'is'therefore
[,
Jconcluded that thisLoccurrence did.notJ. affect:the health 2and. safety of thec
~
1 spublich ',:.
L
( x$
E n..-
r l
e s
gg gQQ W Jna:
L
^ '
a
~ -...
j e
^ i
-i-
- :2 -
(:
C yrective Action:
d on rod 3 of group
'~
l With four hours following the incident fuses were rep ac ice and.
1 verified operable.-
drive stator power In addition, a modification to improve the control rodimplemented on each unit supply. reliability has been initiated and will be during.:its respective refueling outage.