RO 270/77-04:on 770324,dropped Control Rod Group 6 Caused Rod Overlap in Excess of Tech Spec Limit.Caused by Gate Drive Failure of Phase CC in B Power Supply.Fuse Replaced on Rod Group
ML19317F384
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/07/1977
From:
DUKE POWER CO.
To:
Shared Package
ML19317F380 List:
References
RO-270-77-04, RO-270-77-4, NUDOCS 8001140637
Download: ML19317F384 (2)


Text

y nc

~.

--. r g,

.c e

L ;;p'. Gi J

-y 3',,

v 1

~

if. _,

~

' DUKE' POWER COMPANYT f

~

'OCONEE UNIT 2-i:

.c _. Report No.': '_RO-270/ 7 7-4 -~

' Report Date:{A'pril.7, 1977-

~

~ 0ccurrence Date: ' March 24,.'1977 Facility: Oconee Unite 2, Seneca, South' Carolina-u Identification ~of> Occurrence: Rod overlap-in excess of Technical Specification

-limit due to a dropped control. rod group; i'

Conditions Prior'to Occurrence: ~Uniti at 78 percent full power

~

. Description'of Occurrence:

~

p a On March 24,z1977, group 6 control rods dropped into the core from a 67%

. withdrawn position reducing the reactor. power level to'44 percent" full power.

A condition'of 5% control _ rod: overlap between rod group 5 and 6 resulted.

Oconee Technical Specification 3.5.2.5 specifies an overlap of 25 1 5%

between.two adjacent operating control rod groups.

The Integrated Control. System-Immediately-relatched the group 6 rods and

. began withdrawing =the rods in order;to maintain the power level a.t 78%.

r.

-Rod 3 in group 6.did not relatch and this asymmetric. rod' caused power to.

be limited'to 55.. percent;-full-power. The power supply.for rod 3 was de--

energized by removing the fuses. No problems were found so the fuses were reinstalled and~ rod 3 was relatched and realigned with'the. rest of group.6.

L Control rod. group 6 ;was'then placed on auxiliary power and reactor power escalation commenced. : Repairs to control rod group 6 power supply'were completed.within four hours and the-group was returned to its normal power I

supply.

~

[

Apparent Cause-of Occurrence:

~

h This occurrence resulted from the failure of the gate drive of phase "CC"~

ll ~

ine the '?B'? power supply..Normally, the "A" power supply would have held.

[:.

.the rods.in position', however,.the "A".. power supply to the "CC" p'ase

' h

[_

f uiomentarily - failed.. Investigation of the."A": power supply revealed no pro-1 blems. It isipostulated that l prolonged energization of Lone magnetic: phase

-in"the,"A"; power / supply resulted'in tso opposing phases being simultaneously n

nenergized, therefore canceling each other and result'ing in the drop and

.'immediate-relatch of the rods.

e 1

mi

' Analysis of-Occurrence:

ru

_ pv

['<

ThisLincidentirssulted!inl control rodjgroup;6~ dropping Into the core and.a

[>

fcondition of:;approximately Supercentjcontrol rod overlap existing until group.

C6 control fods'.wereire -positioned.and the required overlap was re-established.

K'

.Thisfreductionin control" rod' overlap'did not' affect the: safe operation of I

lthe reactor andinojcore protectionflimit'sEwere approached.

It'is'therefore

[,

Jconcluded that thisLoccurrence did.notJ. affect:the health 2and. safety of thec

~

1 spublich ',:.

L

( x$

E n..-

r l

e s

gg gQQ W Jna:

L

^ '

a

~ -...

j e

^ i

-i-

- :2 -

(:

C yrective Action:

d on rod 3 of group

'~

l With four hours following the incident fuses were rep ac ice and.

1 verified operable.-

drive stator power In addition, a modification to improve the control rodimplemented on each unit supply. reliability has been initiated and will be during.:its respective refueling outage.

I 1

'