Unusual Event 287/75-12:on 751105,personnel Hatch Inner Door Gasket Failed.Caused by Inner Door Unseating Due to Test Pressure.Inner Door Gasket Replaced & Hatch Tested 751112
ML19317F372
Person / Time
Site: Oconee 
Issue date: 12/05/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19317F366 List:
References
RO-287-75-12, NUDOCS 8001140624
Download: ML19317F372 (1)


Text

.

n.

w

,m
.g. 3 DUKE POWER. COMPANY flf e,.1

^

x

.,,m

~ OCONEE NUCLEAR STATION-

~ %-

e g" g4%w..,f]? g00'h,.:. r;;;.

i M

- Report No.~:1 UE-287/75-12~

(Report Date:. December l5, 1975:

a w. ; d,. p g7( '

k.. &

.a

.m i Event Date:- ! November 5,- 1975 '

' Facility: LOconee UnitV3, Seneca,; South' Carolina Identification of-Event: Failure of gasket.'on personnel hatch inner daor Conditihns Prior to Event:.Uniti at.95% full power

~

Description'of Eventi.^

b 60n No' ember.5,51975b a' leak rate' test was performed on Oconee Unit 3 P

v

.. personnel sitch. ;After pressurizing the hatch to 50 psig,s it was observed that theLinner; door gasket had failed.. Further testing was immediately J

discontinued, and the outer personnel hatch door.was locked in the closed position.

Apparent'~Cause of Event:'

-The personnel _hatchileak rate test is performed by pressurizing.the area 1between the'innerfand outer' doors. - The. test tends to unseat the inner door; 4

.therefore. strongbacks'are placed on.the' hatch' side of the inner door to

-maintain the door:.in a; closed condition.- The apparent cause of this incident

~

was the unseating of the inner' door by.the test pressure, resulting in failure ofLtheigasket.

. Analysis of Event:

?The. failure of the personnel hatch inner door gasket resulted'in the loss of' Lintegrity-;of theLinner door..However, it'is highly probable that this: door.

would;have functioned properly during a loss-of-coolant' accident since

~

-contninment pressure.tends to seat the inner door, compressing the' gasket.

Addit'ionally,; the outer door.is: capable.of maintaining containment -integrity.

(

Itsisiconcluded that!the health and safety of the.public was not affected.

iCorrective Action:?

iThei personnel hatch outer ' door was locked clcsed, pending approval'of-a change -

~

~

~

to.0coneelTechnical' Specific'ation'3.6.4.

This change was received on November)11,-.1975 and: permitted:the outer door toLbe opened during power operation:for a maximum ten-minute' interval.to permit access.for= repair of.'

- (the faulty 31anerfdoor: gasket.. The inner door gasket was replaced, and'the fhatch successfully.. tested'on November' 12,[1975.