ML19317F149

From kanterella
Jump to navigation Jump to search
Forwards AO-287/74-06
Date released: 11/27/2019 Download: ML19317F149


AO-287/74-06:on 741029,leak in LPIS Piping in Decay Heat Removal Room Discovered.Caused by Failure of Piping Due to Low Pressure Injection Discharge Header Vibration.Sample Line Repaired & Vibration Coil Added
ML19317F163
Person / Time
Site: Oconee 
Issue date: 11/12/1974
From:
DUKE POWER CO.
To:
References
Download: ML19317F163 (1)
Forwards AO-287/74-06
ML19317F148
Person / Time
Site: Oconee 
Issue date: 11/12/1974
From: Thies A
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F148 (2)