ML19317F053

From kanterella
Jump to navigation Jump to search
Forwards AO-287/75-12
Date released: 11/27/2019 Download: ML19317F053


AO-287/75-12:on 751028,reactor Bldg Air Sampling Line Inlet Valve 3PR-7 Failed to Close During Engineered Safeguards Actuation Testing.Caused by Personnel Error.Breaker Closed & Valve Tested for Operability
ML19317F060
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/10/1975
From:
DUKE POWER CO.
To:
References
Download: ML19317F060 (1)
Forwards AO-287/75-12
ML19317F052
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/11/1975
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F052 (2)