ML19317F001
| ML19317F001 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/15/1973 |
| From: | Miller W US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Thies A DUKE POWER CO. |
| References | |
| NUDOCS 8001080700 | |
| Download: ML19317F001 (1) | |
Text
<
fN) r,ts 15 TOTJ Duke Power Company ATT:I:
Mr. A. C. Thies Senior Vice President Production and Transutission 422 South Church Street P. O. Box 2178 Charlotte, North Carot h 28201 Centlemen:
This refers to the operating license fee ($368,960) paid by Duka i
Power, for Licensa DPR-38.
The fee was based on a proposed full-power operation of 2368 Mwt.
When License DPR-38 was issued on February 6,1973, the operation of the facility a s 11=1ted to 128 Mwt (5% power). Subsequent authorizations were granted on April 30, and June 6, 1973, to allow operation of Oconee Unit 1 at 75% (1926 ht) and 95% (2452 Mwt) power levels. To date the additional 5% (116 Mwt) has not been 4
authorized. Accordingly, the C a ssion will refund the excess operating license fee of $11,020 to Duke Power, based on the out-standing 116 Mwt G $95/Mwt. Duka Power will be robilled for the additional operating licensa fee, at such tice as the additional power increase is granted under License DPR-38.
You will receive the above refund from our Office of the Controller.
Sincerely, 0:b.
.. ed by L,~;n.O.";"^"t_]
T William O. }iiller Business Management Eranch Office of Administration -
Regulation D""]D
]DN Y h
/
,Jo eJu oJu. A $lru_=
{
j 8001080 7 8 O