ML19317E895
| ML19317E895 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/15/1974 |
| From: | Upright C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Thornburg H US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19317E894 | List: |
| References | |
| NUDOCS 8001070695 | |
| Download: ML19317E895 (1) | |
Text
uttr.t3 sT ATE _s
[... 6 ATOMIC ENERGY COMMISSIC)
//
M DU1";nicM OF 2E /.mJ/ CP2.JClC:3
.'li.':.'
nc c,io,. si - s.i.n e'n
.a,,,...,;,
,. f-(. -Y L 2 f, n,. a c w-a u
,r n c t i, e..no r w a t. sr l'
?.*
u t...r..c.to,.0,a um
.)'.L-'rg-6' July 15, 1974 H. D. Thornburg, Chief, Field Support and Enforcement Branch Directorate of Regt.latory Operations, Headquarters DUKE P0tJER COMPANY (OCONEE I and 2), LI 2
the intent of Technical Headquarters evaluation is requested oft Specification 3.2.2 for a dual unit f acility (see attachment)
This specification requires one source per unit of c be available and operable.
If there is a connecting pipe between these boric acid systems for Unit I and Unit 2, is it the intent of the technical specificationh that the Unit 2 concentrated boric acid storage tank _ can act as t e
~
1 if Unit 2 additional source of concentrated boric acid for Unit is shut down and vice versa?
Please provide us with your evaluation as soon as possible.
V]-
(['#7, dhra~:ing Chief
. M. Upright, Act Facilities Operations Branch Transmitted Sia Facsi. ile m
7/15/7h L:20 P.M. ih O
e S
8 A *s a-.
8001070 h p
~